BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 31, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Marshfield, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Street/Road Intersection Construction and Repair, Sidewalks/Curbs/Gutters, Storm Drain and Paving, Utility Street Construction and Excavation, Sewer and Water Construction, Sitework/Excavating and Grading, Concrete Repair , Paving (Asphalt or Concrete) A. Arnold Street Reconstruction: Contract 2023-01 includes the reconstruction of W. Arnold Street, from St. Joseph Avenue to 700 west. The reconstruction of this existing street will include: partial replacement of the existing sanitary sewer mains, replacement of sanitary sewer laterals, replacement of the existing water mains and services, partial replacement of existing storm sewer, and installation of pipe underdrain; along with street improvements including fabric, Breaker-Run Stone subbase, crushed aggregate base course, concrete curb & gutter and driveway approaches, along with traffic control, erosion control, turf restoration (from back-of-curb to front-of-sidewalk), and pavement marking. This project does not include sidewalk repairs or replacements. Asphalt pavement will be done by others. Arnold Street will be closed for this reconstruction, however, pedestrian access must be maintained to residential properties at all times. B Central Avenue Colored Concrete Crosswalk Replacement (2nd Street to 17th Street): Select existing colored concrete crosswalks shall be replaced as indicated in the plans (spreadsheets) and per the discretion of the City Engineer. The amount of said crosswalk replacements that can be accomplished is limited by the budgeted funds for this project (cost of work to be completed cannot exceed budgeted amount). The scope of this project includes full-depth sawing, careful removal of existing colored concrete panels without impacting adjacent concrete surfaces/joints, drilling dowel and tie bars, re-pouring 9-inch colored concrete pavement, and traffic control. Central Avenue shall remain open however lane closures will be required Pre-Qualification: Yes Pre-Bid Meeting Info: None Anticipated Start of Construction: On or After May 15, 2023. Final Completion: On/before August 11, 2023 this project is valued about $800,000 PLAN NO. 3669, 3698

Bid Results

Roads / Highways

$857,265.00

Public - City

Paving, Site Work

38

12

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
26
Bidding Soon
441
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2023

May 15, 2023

Project location map

Multiple Locations, Marshfield, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.