BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a residential development in Woodbine, New Jersey. Working plans call for the demolition of a residential development; and for site work for a residential development.

As of March 20, 2023, project is cancelled. A timeline for the rebid has not yet been established. Demolition and Site Clearing of 1575 Route 47 - The County of Cape May is requesting bids for the demolition and site clearing of the former El Dorado Motel, Block 54 Lot 11, 1575 Route 47 South, Woodbine in the Township of Dennis, NJ. Questions regarding these specifications must be directed in writing to Allison L. Hansen via email at allison.hansen@co.cape-may.nj.us. The deadline for questions is THURSDAY, MARCH 16th, 2023 @ 12:00 P.M., NOON. Demolition: a. Complete demolition and removal of all structures, contents, foundations, piping, mechanical and electrical equipment, and underground utilities (water, wastewater, electrical, etc.). b. Complete demolition and removal of all above and below ground structures; including, but not limited to trees/stumps, concrete slabs and curbs, and landscaping. c. All trees and their stumps are to be removed-extracted from the soil, NOT ground/shredded in place, holes filled with topsoil, graded level, and grass seeded. d. All material, equipment, rubble, debris, and other products of the demolition shallbecome the property of the Contractor for their disposal off-site in accordance with all applicable laws and ordinances. Any sale ofsalvageable materials by the Contractor shall only be conducted off-site. e. The Contractor is responsible to determine the extent of the work required and to verify the accuracy of the property/demolition site. f. The Contractor shall fill and compact all voidsleft by the removal of trees, stumps, pipes, structures, etc. with clean material and a grade consistent with the surrounding area. g. Concrete must be separated from non-recyclable material and taken to a licensed recycling facility. h. Any hazardous materials encountered during demolition must be disposed of in accordance with applicable regulations at the appropriate facility. Notify the Director of.Facilities & Services or designee immediately or as soon as practicable thereafter if hazardous material(s), not previously identified, are found. i. Work is not permitted on Sundays or Holidays. Contractor is responsible for complying with any existing local noise/disturbance regulations.

Final Planning

Residential Subdivision

$200,000.00

Public - County

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
164
Active Projects
59
Bidding Soon
1,496
All Active Projects
671
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2023

April 11, 2023

img_map_placeholder

1575 NJ-47, Woodbine, NJ


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.