Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 31, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in Lees Summit, Missouri. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Full depth asphalt patching, asphalt milling and asphalt overlay, pavement striping, and providing traffic control, as specified by the Owner, including all materials, labor, equipment, supervision, and any and all other items necessary to complete the Work. This Section is a non-exclusive list of various preliminary requirements that the Contractor shall comply with. This list does not include all contractual requirements, and it is important that the Contractor be familiar with all of the Contract Documents in order to ensure that all applicable requirements are met.

Bid Results

Roads / Highways

$3,825,766.00

Public - City

Paving, Site Work

6

20

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
163
Active Projects
75
Bidding Soon
1,347
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2023

June 1, 2023

Project location map

To Be Determined, Lees Summit, MO


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed