BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Renovation of a clubhouse / community center in Westerville, Ohio. Completed plans call for the renovation of a 20,383-square-foot clubhouse / community center.

The work per the contract documents, dated March 8, 2023, and any addenda thereto, includes roof removal and replacement, skylight removal, abandoned curb removal, deck infill, sheet metal removal and replacement, drain modification, roof hatch replacement and reorientation, ladder-up installation, hatch guard rail installation, and appurtenances. The Project Completion Date is November 17, 2023. Questions Due Date: Mar 24th 2023, 3:00 PM EDT Intent to Bid Due Date: Apr 4th 2023, 3:00 PM EDT The WORK in accordance with the CONTRACT DOCUMENTS, dated March 8, 2023, and any addenda thereto, includes roof removal and replacement, skylight removal, abandoned curb removal, deck infill, sheet metal removal and replacement, drain modification, roof hatch replacement and reorientation, ladder-up installation, hatch guard rail installation, and appurtenances. Additionally, there are two Alternate Bids. Alternate Bid 1 consists of the removal of the ladder on the east-facing wall above the Mechanical Room roof and the installation of a new access stair. Alternate Bid 2 includes the installation of a new access door in the masonry wall above the Mechanical Room roof and the installation of a new access stair with landing. Once the CONTRACT is awarded, the CONTRACTOR shall have until November 17, 2023, to fully complete the PROJECT with the following constraint the WORK shall be completed within ninety (90) calendar days once it commences. ENGINEER'S ESTIMATE for the Base Bid: $1,814,000.00 ENGINEER'S ESTIMATE for Alternate Bid 1: $20,000.00 ENGINEER'S ESTIMATE for Alternate Bid 2: $50,000.00 The Q&A period for this opportunity ends 3:00 p.m. (local time) on Friday, March 24, 2023. Any substitution requests must also be submitted by 3:00 p.m. (local time) on Friday, March 24, 2023

Award

Clubhouse / Community Centers

$1,716,875.00

Public - City

Renovation

12

21

2

7

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
80
Bidding Soon
1,113
All Active Projects
450
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2023

June 5, 2023

img_map_placeholder

350 N Cleveland Ave, Westerville, OH

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.