BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a bridge / tunnel in Long Grove, Illinois. Completed plans call for the renovation of a bridge / tunnel.

As of April 21st, 2023 this project is still pending an award decision. Sealed enveloped are to be marked: "Sealed Bid for Village of Long Grove. Please contact QuestCDN at (952) 233-1632 or info@guestcdn.com for assistance in free membership registration, downloading, and working with this digital information. The Robert Parker Coffin Bridge is located on Robert Parker Coffin Road west of the intersection of Old McHenry Road, in Long Grove's downtown business district. This project includes, but is not limited to, the following major work items: remove and replace bridge deck boards and steel vehicle tread plates, improvements to the west transition plate, replacement of galvanized carriage bolts with nuts and washers, cleaning and painting of the top beams, and associated work. This work is subject to the wage provisions of the Illinois Prevailing Wage Act. 820 ILCS 130/0/01 et seq. and the Illinois Substance Abuse Prevention on Public Works Projects Act. 820 ILCS 265/1 et seq relative to prevailing wages of laborers, mechanics, and other workers employed in any Public Works as amended by Public Acts 86799 and 86693. The Village of Long Grove reserves the right to accept or reject any bid, to award all or part of a contract, and to make such awards as are in the best interests of the Village. Factors other than price which will be considered in awarding or rejecting bids shall include the results of reference contacts, and the quality of the bidder's performance on prior Village projects, if any, in the judgment of the Village Board and Village staff. All proposals submitted shall be valid for a period of 60 days. The Village Board will consider the submitted bids at their meeting on March 28, 2023. Construction is anticipated to start within 10 days of the contract execution (based on material availability) and completed over 10 working days. Construction completion date to be established at the Pre-Construction meeting.

Bid Results

Bridges / Tunnels

$88,800.00

Public - City

Renovation

6

14

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
197
Active Projects
127
Bidding Soon
2,177
All Active Projects
960
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 22, 2023

April 21, 2023

img_map_placeholder

Robert Parker Coffin Rd, Long Grove, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.