Site work and paving for a mixed-use development in Champaign, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; and sidewalk / parking lot.

Alley Maintenance: Approximately 350 feet of alley reconstruction will be performed providing a PCC pavement on an aggregate subbase. North Campus Infrastucture Repair: The east / west alley between First Street and the Boneyard will be reconstructed for approximately 150 feet providing a PCC pavement on an aggregate subbase. Sidewalk and Ramp Repairs: ADA accessible ramps will be placed and mid- block deteriorated sidewalk will be removed and replaced on John Street from Willis Avenue to Russell Street. Local Street Pavement Reconstruction: Deteriorated pavement will be removed and replaced at three locations. Pavement will be reconstructed on Healey Street from Wright Street to Sixth Street Clark Street Lighting Improvements: The existing lighting will be upgraded on Clark Street from Randolph Street to State Street, and also on Randolph Street from Clark Street to University Avenue. Deteriorated sidewalk on Clark Street will also be removed and replaced. Traffic Signal Upgrades: The work will be performed at the intersection of Prospect Avenue with Town Center Boulevard, the intersection of Randolph Street with Green Street, and the intersection of Neil Street with Market view Drive. Market Street HMA Resurfacing: Pavement will be resurfaced on Market Street from Marshall Street to North of Willow Street. The City of Champaign, Illinois, reserves the right to reject any or all bids or portions thereof and to waive any formality or technicality in any bids in the interest of the City A utilization goal of 10% MBE (Minority Business Enterprise) and 5% WBE (Woman Business Enterprise). A workforce participation goal of 20% MBE and 15% WBE. Workforce participation goals refer to the percentage of minority and female individuals employed on a project. Bid Guaranty in an amount equal to at least TEN PERCENT (10%)

Bid Results

Sidewalks / Parking Lot

$2,663,380.00

Public - City

Paving, Site Work

207

4

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Construction Layout, Execution, Application
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry
Division 08 - Openings

Division 08 - Openings

Hardware
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Backfill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Planting, Turf and Grasses, Seeding, Sodding
Division 33 - Utilities

Division 33 - Utilities

Storm Drainage Utilities, Culverts, Pipe Culverts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
43
Bidding Soon
594
All Active Projects
282
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 23, 2023

May 17, 2023

img_map_placeholder

Multiple Locations, Champaign, IL

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

2023 Infrastructure Maintenance Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.