Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Sacramento, California. Completed plans call for the renovation of a educational facility.
https://www.constructiondive.com/news/april-largest-commercial-construction-starts/717146/ The $3.7 billion UC Davis Medical Center in Sacramento, California. ____________________________ The UC Davis Medical Center, located in Sacramento, has a 50-year history of providing high-quality surgical care to patients across the greater Sacramento region and the 33 counties it serves. UC Davis Medical Center is ranked among the U.S. News & World Report top 50 in Cardiac, Lung, and Neurosurgery and designated High Performing in several other surgical specialties. The Surgery & Emergency Services Pavilion (SESP) and the Same Day Surgery Center (SDSC) OR Technology Integration Project would address needed upgrades to the OR Lights/Monitor booms due to boom failures beyond the ability to repair and/or replace parts. In the SESP, the project will upgrade the OR Audio/Visual Technology within the twenty-four (24) Operating Room including combining the AV network head end equipment into one new centralized AV Room. Two (2) of the twenty-four (24) Operating Rooms will require conversion to Cardiovascular Operating Rooms (CVOR’s), two (2) of the twenty-four (24) Operating Rooms will require conversion to Flex-Case Operating Rooms (FCOR’s) and one (1) will require conversion to a Hybrid OR. These modifications require reconfiguration of the rooms boom orientations, structural components, med gas needs, laminar air flow and technology upgrades. Design Development efforts will include design of improvements to the Pre- Op and PACU areas. Schematic Design is nearing completion with Design Development commencing immediately. Fire Protection Design Build services will begin upon DB Fire Protection Trade Partner Award and Contract Execution. The firms selected by this Prequalification RFQ process will then be invited to respond to a Requests for Proposals (RFP) phase of Design Build Trade Partner selection. The selected Design Build Trade Partner firm will be contracted under the General Contractor through Design Development to Cx and Closeout. Your firm will be the Fire Protection Engineer of Record (EOR) for this project. DB Fire Protection Trade Partner firms submitting to prequalify are required to have the appropriate California Contractor State license(s). The Operating Rooms Integration Modernization project is a Progressive Design-Build delivery model in which the University has selected the Design-Builder as Swinerton Builders (SB) and the Architect of Record (AOR) as Taylor Design (TD). The University, Swinerton and Taylor Design will select the most qualified Design Build Trade partners. The goal is to create an integrated, highperforming, LEAN design team that will deliver the best-in-class project outcome for UC Davis Health. The Operating Rooms Integration Modernization project will require intensive and close collaboration between the Design-Builder, the Architect, all consultants, UCDH staff, OSHPD, the State Fire Marshal, Design-Build and Design Assist subcontractors, all other subcontractors
Post-Bid
Educational
$40,000,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 23, 2024
June 24, 2024
4301 X St, Sacramento, CA
Related To This Project
Sacramento, CA
Bid Date: Mar 17 2023
Sacramento, CA
Bid Date: Aug 30 2023
Sacramento, CA
Bid Date: Apr 06 2023
Sacramento, CA
Bid Date: Mar 30 2023
Sacramento, CA
Bid Date: Apr 18 2023
Sacramento, CA
Bid Date: Mar 23 2023
Sacramento, CA
Bid Date: Apr 05 2023
Sacramento, CA
Bid Date: Mar 22 2023
Sacramento, CA
Bid Date: Apr 04 2023
Sacramento, CA
--
Sacramento, CA
Bid Date: Mar 29 2023
Sacramento, CA
Bid Date: Apr 11 2023
Sacramento, CA
--
Sacramento, CA
Bid Date: Mar 17 2023
Sacramento, CA
Bid Date: Apr 19 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.