Published April 24, 2023 at 8:00 PM

Updated October 1, 2024

Site work for a bridge / tunnel in Pembroke, Massachusetts. Completed plans call for site work for a bridge / tunnel.

The Town of Pembroke, Massachusetts, the Awarding Authority, invites sealed bids for the Herring Run Culvert Replacement, Town of Pembroke, Massachusetts in accordance with the documents prepared by Environmental Partners Group. The Work under this Contract includes, but is not necessarily limited to, replacement of the existing Herring Run Culvert. The project will include: stream bypass and dewatering; erosion control measures; removal of the existing twin 36" CMP pipes and headwall; installation of precast concrete three-sided box culvert, headwalls, and wing walls; installation of a packed crushed stone access road; site restoration; and furnishing and installing all proposed items and necessary and incidental appurtenances to complete the work. Item # 1: ( 72-14-00-00-0000 ) Herring Run Culvert Replacement, U N S P S C Code: 72-14-00 Heavy construction services 72-14-00-00 Heavy construction services 72-14-00-00-0000 Heavy construction services Each individual or firm recorded as having received the contract documents will be notified by email if and when addenda are issued. Hard copies of addenda will not be mailed or faxed to plan holders. It is the sole responsibility of the Bidder to review any and all addenda prior to the bid opening online. Construction must be complete 120 calendar days from and including issuance of a notice to proceed, and/or receipt of fully executed contract. All proposed work at the culvert shall be sequenced as described in the Contract Drawings. All in-water work shall be completed within time of year restriction outlined in the project permits. Each bid shall also be accompanied by a bid security in the form of a certified, treasurer's or cashier's check, bid bond or cash in the amount of 5 percent (5%) of the value of the Bid. Bid Security Deposit shall be at least five percent (5%) of the greatest possible bid amount, considering all alternates. Bid Bonds issued by a surety company must be uploaded with the other required forms. Bidders providing bid bonds in the form of cash or check must complete and upload the Bid Bond Affidavit Form. Wage rates for this project are subject to the minimum wage rates per M.G.L., Ch. 149, and Sections 26 to 27G, inclusive. Successful bidder must furnish 100 percent Construction Performance Bond and 100 percent Construction Payment Bond with a surety company acceptable to the Owner. The bidding and award of the Contract shall be in full compliance with Sections 44A to 44J inclusive of Chapter 149 of the General Laws of the Commonwealth of Massachusetts as last revised. Construction must be complete 120 calendar days

Bid Results

Bridges / Tunnels

$245,686.00

Public - City

Site Work

11

13

12

7

Subscribe For Documents

54 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Multiple Contract Summary, Work Sequence, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Project Meetings, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Assurance, Manufacturer?s Field Services, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Site Remediation, Physical Decontamination, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings, Common Work Results for Furnishings, Fabrics
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Mowing, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Trees, Planting Accessories
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures, Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
310
Active Projects
186
Bidding Soon
2,500
All Active Projects
1,114
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 19, 2023

May 19, 2023

img_map_placeholder

211 Barker St, Pembroke, MA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Herring Run Culvert Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.