BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 21, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a civil project in Vinton, California. Working plans call for site work for a road / highway; for paving for a road / highway; and bridge / tunnel.

UPDATE THIS SOLICITATION WILL NOT BE POSTED ON SAM.GOV, WE ARE GOING WITH A DIFFERENT APPROACH. THANK YOU TO ALL WHO HAVE SHOWN INTEREST. THIS IS ONLY A PRE-SOLICITATION NOTICE Synopsis 12363N23R4008 THE SOLICITATION FOR THIS PROJECT WILL BE POSTED ON OR ABOUT MARCH 24, 2023. PROJECT DESCRIPTION: The Frenchman Lake Roads Reconstruction project consists of grinding the existing AC and chip sealed surfaces and blending the pulverized material with a 1" course equivalent of crushed base aggregate, placing a 3" course of hot asphalt, replacing corrugated metal culverts, repairing a cattle guard, and painting fog-lines on each edge or the new asphalt. Option 1 is included and consists of reconditioning and paving road 25N11F, the access to the Frenchman Fire Station. Specific Requirements for the Base items are: All existing AC and chip seal pavement is to be pulverized, blended with additional aggregate, reshaped, and compacted. Minimum thickness shall be 4". Apply a prime coat to compacted aggregate. Placing, shaping, and compacting hot-mix asphalt concrete to produce a single compacted 3" course. Repairing the cattle guard on 25N11. Remove and disposing off Forest Service land, two existing 18" metal culverts. Furnish and replace with 24" corrugated steel culvert pipes (CMPs) with flared end-sections. Furnish and install six traffic control signs (locations TBD) and four object markers on the repaired cattle guard. Traffic control for public assess to campgrounds and other Forest Service facilities. Specific Requirements for Option 1, 25N11F, are: Remove the existing aggregate surface course and stockpile at the Frenchman Fire Station. Recondition and reshape the roadbed surface. Reconstruct the inside ditch. Blend new aggregate with the stockpiled aggregate, redistribute, shape, and compact the new base course. Minimum thickness shall be 5" Place, shape and compact a single 3" course of hot-mix asphalt concrete as described in the base item above. PROJECT LOCATION: The project is located on the Beckwourth Ranger District of the Plumas National Forest, California. The roads run along the south-west and south-east shores of Frenchman Lake. They connect with CA 284 approximately eight miles north of CA 70 at Chilcoot , CA. NFSR 25N11 intersects with CA 284 at the Frenchman Lake Dam. The location is: Survey Location: T24N, R16E, Sec. 33, NE 1/4 GPS location: 39deg 53.565', -120deg 11.465' NFSR 24N01 begins at the east end of the dam Contractors shall furnish all labor, supervision, equipment, materials, transportation, supplies (unless specified elsewhere as Government-furnished), and incidentals required to accomplish specified work in compliance with the terms, specifications, and provisions of the contract. Work is estimated to begin around May 23, 2023. Engineering point of contact is Francisco Rico, telephone: 530-283-7758/530-570-2972 or email Francisco.Rico@usda.gov. Both performance and payment bonds will be required for this project as well as a bid guarantee. Estimated project value is between $1,000,000 and $5,000,000. NAICS 237310 with size standard $45 mil. This project is set aside 100% for small business. The method of contractor selection has not been determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Roads / Highways

$5,000,000.00

Public - Federal

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
1
Bidding Soon
325
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 23, 2023

Project location map

Frenchman Lake Rd, Vinton, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.