BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 29, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of a municipal facility in Metairie, Louisiana. Completed plans call for the renovation of a municipal facility.

JEFFERSON PARISH reserves the right to cancel all or any part if not shipped promptly. No charges will be allowed for parking or cartage unless specified in quotation. The order must not be filled at a higher price than quoted. JEFFERSON PARISH reserves the right to cancel any contract at anytime and for any reason by issuing a THIRTY (30) day written notice to the contractor. Contractor must hold current applicable JEFFERSON PARISH licenses with the Department of Inspection and Code Enforcement. Contractor shall obtain any and all permits required by the JEFFERSON PARISH Department of Inspection and Code Enforcement. The contractor shall be responsible for the payment of these permits. All permits must be obtained prior to the start of the project. Contractor must also hold any and all applicable Federal and State licenses. Contractor shall be responsible for the payment of these permits and shall obtain them prior to the start of the project. We extend this proposal to provide labor, materials, equipment, transportation, and all other incidentals necessary to remove and properly dispose of one (1) existing Liebert system and supply and install one (1) new Liebert system at the Jefferson Parish First Parish Courthouse . Install a new 316 stainless steel secondary pan for the new Liebert unit. • Emergency pan shall be three inches deep and shall encompass the entire bottom of the unit. • New Liebert units shall be supported two inches off the emergency pan. • All supports shall have vibration arrestors to prevent excess noise and vibration. • All supports shall be corrosion-resistant. • Supply and install new type L copper condensate primary and secondary drain lines. • Install copper unions for easy access to primary and secondary drain lines. • Install type L copper P-Trap in the primary drain line. • Install overflow shutoff switch on primary and secondary drain lines See attachment “A”. • Overflow shutoff switches shall be wired to the new air handler and shut the system off in case of an overflow or stoppage in the primary or secondary drain lines. Install in-line Cleanout in primary drain lines. • All joints shall be soldered on primary and secondary drain lines. • Run drain lines to the nearest floor drain. • Primary and secondary drain lines shall be supported with a metal framing support system and fasteners. • Both primary and emergency drain lines shall be insulated with a closed cell foam insulation with a minimum wall thickness of ½ inch

Award

Municipal

$65,289.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
199
Active Projects
73
Bidding Soon
856
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 20, 2023

August 21, 2023

Project location map

924 David Dr, Metairie, LA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.