Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 29, 2023 at 8:00 PM
Updated January 26, 2024
Renovation of a municipal facility in Metairie, Louisiana. Completed plans call for the renovation of a municipal facility.
JEFFERSON PARISH reserves the right to cancel all or any part if not shipped promptly. No charges will be allowed for parking or cartage unless specified in quotation. The order must not be filled at a higher price than quoted. JEFFERSON PARISH reserves the right to cancel any contract at anytime and for any reason by issuing a THIRTY (30) day written notice to the contractor. Contractor must hold current applicable JEFFERSON PARISH licenses with the Department of Inspection and Code Enforcement. Contractor shall obtain any and all permits required by the JEFFERSON PARISH Department of Inspection and Code Enforcement. The contractor shall be responsible for the payment of these permits. All permits must be obtained prior to the start of the project. Contractor must also hold any and all applicable Federal and State licenses. Contractor shall be responsible for the payment of these permits and shall obtain them prior to the start of the project. We extend this proposal to provide labor, materials, equipment, transportation, and all other incidentals necessary to remove and properly dispose of one (1) existing Liebert system and supply and install one (1) new Liebert system at the Jefferson Parish First Parish Courthouse . Install a new 316 stainless steel secondary pan for the new Liebert unit. • Emergency pan shall be three inches deep and shall encompass the entire bottom of the unit. • New Liebert units shall be supported two inches off the emergency pan. • All supports shall have vibration arrestors to prevent excess noise and vibration. • All supports shall be corrosion-resistant. • Supply and install new type L copper condensate primary and secondary drain lines. • Install copper unions for easy access to primary and secondary drain lines. • Install type L copper P-Trap in the primary drain line. • Install overflow shutoff switch on primary and secondary drain lines See attachment “A”. • Overflow shutoff switches shall be wired to the new air handler and shut the system off in case of an overflow or stoppage in the primary or secondary drain lines. Install in-line Cleanout in primary drain lines. • All joints shall be soldered on primary and secondary drain lines. • Run drain lines to the nearest floor drain. • Primary and secondary drain lines shall be supported with a metal framing support system and fasteners. • Both primary and emergency drain lines shall be insulated with a closed cell foam insulation with a minimum wall thickness of ½ inch
Award
Municipal
$65,289.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 20, 2023
August 21, 2023
924 David Dr, Metairie, LA
Related To This Project
Metairie, LA
Bid Date: Apr 20 2023
Metairie, LA
Bid Date: Apr 13 2023
Metairie, LA
Bid Date: Apr 20 2023
Metairie, LA
Bid Date: Apr 18 2023
Metairie, LA
Bid Date: Apr 18 2023
Metairie, LA
Bid Date: May 02 2023
Metairie, LA
Bid Date: May 11 2023
Metairie, LA
Bid Date: May 18 2023
Metairie, LA
Bid Date: Apr 18 2023
Metairie, LA
Bid Date: Mar 16 2023
Metairie, LA
Bid Date: Feb 28 2023
Metairie, LA
Bid Date: Feb 28 2023
Metairie, LA
Bid Date: Mar 16 2023
Metairie, LA
Bid Date: Mar 14 2023
Metairie, LA
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
