Published May 23, 2023 at 8:00 PM

Updated February 10, 2024

Renovation of a detention facility in Portland, Oregon. Completed plans call for the renovation of a detention facility.

The Oregon Department of Corrections seeks bidders for CRCI for the GENERATOR CONTROLS UPDATE project. The single point of contact is: Craig.L.Heilman (Craig.L.Heilman@doc.oregon.gov) at (503) 983-0969. The following range is a project estimate for bonding purposes: $150K - $225K Project Start Date: Ten (10) Calendar Days from NOTICE TO PROCEED Substantial Completion: 6/1/2023 Final Completion: 6/30/2023 Liquidated damages of $590.00 will apply to the contract resulting from this ITB. Failure to substantially complete the Project by the, date of Substantial Completion, as specified in the Contract, will result in damage to the State of Oregon. Moreover, failure to fully complete the Project by the date of Final Completion, as specified in the Contract, will also result in damage to the State of Oregon Since actual damage will be difficult to determine, it is agreed that the Contractor shall pay to the State of Oregon, not as a penalty but as liquidated damages, $590.00 per calendar day elapsed in excess of the Substantial Completion date stated in Section 3 of this Agreement. Moreover, it is agreed that the Contractor shall pay to the State of Oregon, not as a penalty but as liquidated damages, $590.00 per calendar day elapsed in excess of the Final Completion date stated in Section 3 of this Agreement. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Jails / Prisons

$225,000.00

Public - State/Provincial

Renovation

9

7

1

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Cleaning and Waste Management
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Precast Concrete, Precast Structural Concrete
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roofing and Siding Panels, Siding
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Ceilings
Division 10 - Specialties

Division 10 - Specialties

Storage Specialties, Lockers
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Fountains
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Hangers and Supports for Plumbing Piping and Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Hangers and Supports for HVAC Piping and Equipment, HVAC Air Distribution, HVAC Ducts and Casings, Air Duct Accessories, Dampers
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Manufacturing Equipment, Dies and Molds, Dies, Molds

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
46
Bidding Soon
783
All Active Projects
307
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2023

April 28, 2023

img_map_placeholder

9111 NE Sunderland Ave, Portland, OR

Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

CRCI Generator Controls Update

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.