BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Franklin Park, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The Phase 3 East Industrial Park Improvements Project Consists of 550 Lf of Storm Sewer Improvements With 12 Storm Structures, 6,000 Sy of Full Depth Asphalt Roadway Removal, 4,400 Sy of Cement Stabilization, 4,400 Sy of 6 in. Asphalt Roadway, 1,840 Sy 4.5 in. Asphalt Roadway, Partial Removal and Replacement of 3,700 Sy Asphalt Roadway to a Depth of 2.5 in., the Removal and Replacement of 2,000 Lf of Curb & Gutter, 1,000 Lf of Flat Curb, 5,000 Sf of Sidewalk, 600 Sy of Concrete Drive Aprons, 3,000 Sy of Lawn Restoration, and Manhole Casting Adjustments on E. Frontage Road and E. King Street. Bid Security in the amount of not less than five percent (5%) of the Bid shall accompany each Bid in the form of bid bond, cash, certified check, cashier's check or draft payable to The Village of Franklin Park. The Bidder to whom a Contract is awarded shall be required to furnish a Performance Bond and a Payment Bond or an Irrevocable Letter of Credit acceptable to the Village for 100 percent of the Contract Price, in accordance with the requirements of the Bid Document. The Prime Contractor shall be prequalified by the Illinois Department of Transportation in the category of HMA Paving in the amount of at least $500,000.00. All subcontractors for cement stabilization, concreting, roadway excavation and HMA installations, landscaping shall be IDOT prequalified. Bids submitted by non-IDOT prequalified will be rejected. The successful Bidder shall be required to furnish certificates and policies of insurance as required under IDOT LR 107 of the Bid Document and Section IV.G to J of the Tollway S11C Intergovernmental Agreement between the Illinois Tollway and Village of Franklin Park. The Village reserves the right to reject any and all bids, to waive any informalities or technicalities in bidding, and to accept the Bid which best serves the interests of the Village. Site Directions: King St (North of I-294), Franklin Park IL project has been cancelled.

Post-Bid

Roads / Highways

$2,000,000.00

Public - City

Paving, Site Work

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
174
Active Projects
89
Bidding Soon
1,830
All Active Projects
795
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 29, 2023

October 30, 2023

img_map_placeholder

Multiple Locations, Franklin Park, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.