EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 25, 2023 at 8:00 PM

Updated October 1, 2024

Site work and paving for a playground / park / athletic field in Channahon, Illinois. Working plans call for site work for a playground / park / athletic field; and for paving for a playground / park / athletic field.

**As of August 25, 2023, all bids have been rejected. A timeline for rebidding has not been established.** **As of June 7, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** The Channahon Park District does hereby invite sealed bids for: Arroyo Trails Park Restroom. Work will include site clearing, earthwork operations, asphalt paving, concrete curbs, walks and paving, site furnishings, playground equipment installation, planting, and seeding. All bidders will be required to submit Bid Security in the form of a Bid Bond in the amount of 10% of the Base Bid, payable to the Channahon Park District. In lieu of a Bid Bond, a Certified or Cashiers Check in the amount of 10% of the Base Bid, payable to the Channahon Park District, will be accepted. Contractor shall not pay less than the prevailing rates of wages to all laborers, workmen, and mechanics performing work under this contract, and shall comply with the requirements of the Illinois Wages of Employees on Public Works Act (820 ILCS 130/1-12). The Channahon Park District reserves the right to reject any and all proposals, parts of any and all proposals, or to waive technical errors or omissions in submitted proposals. No submitted bid may be withdrawn until a period of sixty (60) days after the bid opening date, without written consent of the Channahon Park District. The Channahon Park District encourages minority business firms to submit bids on this project and the successful contract bidder to utilize minority businesses as sub-contractors for supplies, equipment, services, and construction. Questions should be directed to Eric Hornig or Jenna Beck, Hitchcock Design Group at 630.961.1787. Cut off for Questions: March 17, 2023, 1:00 pm Pre-Bid Meeting: None: Site is open for review

Final Planning

Playgrounds / Parks / Athletic Fields

$2,000,000.00

Public - City

Paving, Site Work

12

12

54

6

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Cleaning and Waste Management, Progress Cleaning
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Plants, Trees
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment

Find More Local Projects

Within 75 Miles of This Project
231
Active Projects
158
Bidding Soon
2,241
All Active Projects
991
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2023

January 15, 2024

img_map_placeholder

25731 W Silver Leaf Cir, Channahon, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Arroyo Trails Restroom

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.