BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a playground / park / athletic field in San Antonio, Texas. Completed plans call for site work for a playground / park / athletic field.

Football field and track improvements at Wagner High School, located. Scope of project will include the removal of the existing natural turf from the football field and replacing with new synthetic turf and the demolition and reconstruction of the existing track. In addition to these improvements, flat work and asphalt will be replaced for ADA compliance, the on-site detention pond will be expanded to accommodate current Atlas 14 standards A proposal bond in the amount equal to five percent (5%) of the Base Proposal, plus all additive alternatives, if applicable, shall be attached to the Proposal Form ESTIMATED PROJECT BUDGET: $4,800,000.00 (BASE BID), $720,000.00 (ALTERNATE BID #1), $360,000.00 (ALTERNATE BID #2), and $63,000.00 (ALTERNATE BID #3), based on the Plans and Specifications All questions concerning this Proposal must be received no later than 2:00 PM, on Monday, March 27, 2023. Inquiries should be identified by title, date, proposal number, and should be submitted and posted to Judson ISD Public Purchase site. Judson ISD will then forward all inquiries to the Architect. Inquiries sent in any other format and/ or any other party will not be considered. The Project must be complete and ready for occupancy not later than September 15, 2023 (FIELD/BASE BID) and December 15, 2023 (TRACK/ALTERNATE(S) BID) assuming that the successful Offeror is given notice of its top ranking on or before April 21, 2023. Any proposal must provide for final completion by this date. Alternately, Offerors are asked to submit the number of calendar days required for completion of the Work, if completion of the Work shall be prior to such date. Offerors are advise that The Project is subject to liquidated damages in the amount of $1,250.00 per day for each day's delay in the Substantial Completion of the Work.

Award

Playgrounds / Parks / Athletic Fields

$6,695,760.00

Public - County

Site Work

50

16

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
28
Bidding Soon
2,121
All Active Projects
828
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 6, 2023

June 5, 2023

img_map_placeholder

3000 N Foster Rd, San Antonio, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.