Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 25, 2025 at 8:00 PM
Updated September 26, 2025
Site work for a bridge / tunnel in Everett, Washington. Working plans call for site work for a bridge / tunnel.
The existing paint on the steel surfaces is weathered and damaged, allowing corrosion to occur. Cleaning and painting the steel surfaces will preserve the bridge and maintain the safety of the highway. Length : 0.190 Begin Termini : MP 5.42 End Termini : MP 5.63 As of September 25 , 2025, the project is in Final Planning status. Anticipated letting Year is 2025. WSDOT - SR 529 / Southbound Steamboat Slough Bridge - Bridge Painting *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. Cost Range 15 - 20M *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Final Planning
Bridges / Tunnels
$11,392,699.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 1, 2025
WA-529, Everett, WA
Related To This Project
Everett, WA
Bid Date: Apr 23 2019
Everett, WA
Bid Date: Oct 31 2023
Everett, WA
Bid Date: Oct 19 2023
Everett, WA
Bid Date: Oct 12 2023
Everett, WA
Bid Date: Feb 13 2024
Everett, WA
Bid Date: Nov 03 2023
Everett, WA
Bid Date: Sep 26 2023
Everett, WA
Bid Date: Sep 21 2022
Everett, WA
Bid Date: Sep 08 2022
Everett, WA
--
Everett, WA
Bid Date: Oct 13 2020
Everett, WA
Bid Date: May 06 2022
Everett, WA
Bid Date: Jun 08 2022
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
