BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 11, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in North Aurora, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Base bid 1 - Geneva Construction Co - $150,962 Base bid 2 - Geneva Construction Co - $2,087,432 As of April 04,2023 this project has not yet been awarded. A timeline for award has not yet been established. The proposed improvements will be completed on the following streets: Carpenter Court, Chesterfield Lane, Erickson Court, Flynn Court, Gorham Court, Graham Road, Hamilton Lane, Harding Court, Johnson Court, Pine Creek Drive, Schneider Court, Stewart Avenue, and Thompson Avenue. The project will include the following pay items and quantities. Preparation of Base (49,496 SY), Hot-Mix Asphalt Surface Removal 4" (49,496 SY), Hot-Mix Asphalt Binder Course, IL-19.0, N50 (6,520 TON), Hot-Mix Asphalt Surface Course, Mix "D", N50 (5,166 TON), Combination Concrete Curb and Gutter Removal and Replacement (8,451 FT), Sidewalk Removal (21,548 SF), PCC Sidewalk 5 Inch (21,349 SF), Detectable Warnings (1,190 SF), Structure Adjustments (86 EA), HMA Driveway (1,221 SY), and Restoration (3,204 SY) Each bid must be accompanied by a Bid Guarantee in the form of a Bid Bond from a company with an A-1 best rating, or a cashiers check in the amount of five percent (5%) of the total bid and made payable to the Village of North Aurora, 25 East State Street, North Aurora, Illinois, 60542. The Village of North Aurora reserves the right to reject any or all bids and to waive irregularities and informalities in the bids received. All applicable laws, ordinances, resolutions, and the rules and regulations of all authorities having jurisdiction over construction of the Project shall apply to the contract throughout including the Illinois Prevailing Wage Act (Ill. Rev. Stat. Ch. 48, Sects 39s-1-12), the Illinois Preference Act (Ill. Rev. Stat. Ch. 48, Sects. 2201-2207) and an Apprenticeship Training Program certified by the USDOL. Please contact Brandon Tonarelli at 331.385.6432 if you have any questions Location Various Local Roads in the Village of North Aurora, Kane County. Project Length 2.81 miles Proposed Improvement Pavement patching, pavement milling, HMA resurfacing, preparation of base, aggregate subgrade improvement, removal and disposal of unsuitable materials, curb and gutter removal & replacement, sidewalk removal & replacement, structure adjustments, restoration, traffic control and all other ancillary work to complete the project

Award

Roads / Highways

$2,087,432.00

Public - City

Paving, Site Work

74

9

6

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
453
Active Projects
242
Bidding Soon
3,358
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2023

April 28, 2023

Project location map

Multiple Locations, North Aurora, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.