Site work and paving for a mixed-use development in Reading, Pennsylvania. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of May 25, 2023, the project has been awarded. A timeline for construction has not been confirmed The work shall consist of milling, base repair & overlay of selected streets in the City of Reading, and also includes the design and installation of ADA compliant curb ramps and associated signal improvements as specified in the Contract Documents. The project is being funded by the Municipal Liquid Fuels Program. Funding requirements must be followed. Each proposal shall be accompanied by bid surety in the amount of ten percent (10%) of the proposal. A certified check or bid bond will be accepted. Attention is called to the fact that Pennsylvania prevailing wage rates must be paid by the contractor and that employees shall not be discriminated against because of race, color, age, religion, sex or national origin. The City of Reading reserves the right to accept or reject any and all bids, and to accept or reject any part of a bid, as may be in the public interest. Such questions shall be submitted to Purchasing no later than March 28, 2023. Responses to questions shall be issued to all bidders in the form of a written addendum no later than April 6, 2023 SUMMARY This project consists of but is not limited to the removal and replacement of roadway pavement and related items such as subbase repairs, base repairs, leveling, ADA curb ramp improvements and associated signal improvements, pavement markings, and loop detection systems. In accordance with this contract, this work will take place on the following roads owned and maintained by the City of Reading. All paving work is to be substantially complete by October 31, 2023, and all ADA improvements substantially complete by August 31, 2024. The anticipated notice to proceed for this project is May 31, 2023. The City reserves the right to add and/or remove roads and/or items from the list below, or otherwise modify the order or priority of roads to be repaved, to suit the needs of the City at any time during the life of this contract. Schedule W. Spring Street (Centre Avenue, SR 61 to Ritter Street) Mill and overlay the entire width of the roadway. Complete pavement subbase and/or base repairs and install leveling where marked out in the field by the City Representative. Replace pavement markings in kind. Design and construct ADA compliant concrete curb ramps and associated signal improvements. W. Robeson Street (Weiser Street to Centre Avenue, SR 61) Mill and overlay the entire idth of the roadway. Complete pavement subbase and/or base repairs and install leveling where marked out in the field by the City Representative. Replace pavement markings in kind. Design and construct ADA compliant concrete curb ramps. Weiser Street (Robeson Street to W. Green Street) Mill and overlay the entire width of the roadway. Complete pavement subbase and/or base repairs and install leveling where marked out in the field by the City Representative. Replace pavement markings in kind. Design and construct ADA compliant concrete curb ramps. Clinton Street (River Road to W. Greenwich Street) Mill and overlay the entire width of the roadway. Complete pavement subbase and/or base repairs and install leveling where marked out in the field by the City Representative. Replace pavement markings in kind. Design and construct ADA compliant concrete curb ramps. Tulpehocken Street (W. Douglass Street to W. Green Street) Mill and overlay the entire width of the roadway. Complete pavement subbase and/or base repairs and install leveling where marked out in the field by the City Representative. Replace pavement markings in kind. Design and construct ADA compliant concrete curb ramps. Lincoln Street (W. Douglass Street to W. Oley Street) Mill and overlay the entire width of the roadway. Complete pavement subbase and/or base repairs and install leveling where marked out in the field by the City Representative. Replace pavement markings in kind. Design and construct ADA compliant concrete curb ramps. McKnight Street (W. Windsor Street to W. Green Street) Mill and overlay the entire width of the roadway. Complete pavement subbase and/or base repairs and install *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Award

Roads / Highways

$4,903,555.00

Public - City

Paving, Site Work

3

5

4

4

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
293
Active Projects
136
Bidding Soon
2,138
All Active Projects
1,034
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2023

May 31, 2023

img_map_placeholder

Multiple Locations, Reading, PA

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.