Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published October 21, 2025 at 8:00 PM
Updated October 22, 2025
Renovation of an educational facility in Richmond, Virginia. Conceptual plans call for the renovation of a 12-square-foot educational facility.
Johnson Hall Repositioning Project has been canceled as of October 21 2025 Question Deadline 03/20/2023 at 4:00 PM ET Questions concerning this RFQ must be received via email n Johnson Hall is a 12-story brick building originally constructed as private apartments and later reconfigured as student housing. Built in 1915, Johnson Hall is the oldest residence hall on the campus and was identified as a candidate for renovations and decompression in the 2014 Housing Master Plan. In November 2021, VCU was unexpectedly forced to close Johnson Hall due to elevated humidity and moisture levels in the building, and more than 400 first-year students were relocated to other VCU residence halls, off-campus apartments, and a hotel for the duration of the fall term. The building is in the Monroe Park Historic District. Appendix A is the National Park Service Nomination Form and is listed as 26 North Laurel Street. When in operations, Johnson housed approximately 518 students -- primarily first-year students -- in a coeducational environment with each floor designated for only male or female residents. The residence hall offers a community atmosphere and includes complete laundry facilities on each floor, student bedrooms, community space for social and educational functions, vending machines and video games. Additional services include a fulltime housekeeping staff responsible for public areas and 24-hour security staff. VCU desires to perform a comprehensive renovation of the building, including new MEP systems and reconfigured student residences for first-year students. The University engaged Hanbury to provide two feasibility studies: an interim plan study and a full scope renovation study (the "Hanbury Report"). A copy of the Hanbury Report and its recommendation is included in Appendix A. Offeror(s) should note that the Hanbury Report is a reference point for VCU's initial assessments of the estimated costs, methods, and timing of renovation options for Johnson Hall. More information about the school's program goals and requirements will be included in the RFP. In addition, the University prefers a comprehensive / full scope renovation; however, the University is interested in feedback from Offerors for the best value to VCU and its students
Project Abandoned
Educational
$80,083,502.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 3, 2023
October 22, 2025
801 W Franklin St, Richmond, VA
Related To This Project
Richmond, VA
--
Richmond, VA
--
Richmond, VA
Bid Date: Apr 17 2023
Richmond, VA
Bid Date: May 01 2023
Richmond, VA
Bid Date: May 01 2023
Richmond, VA
Bid Date: May 01 2023
Richmond, VA
Bid Date: Mar 28 2023
Richmond, VA
--
Richmond, VA
--
Richmond, VA
--
Richmond, VA
--
Richmond, VA
--
Richmond, VA
--
Richmond, VA
Bid Date: Apr 13 2023
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed