Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a water / sewer project in Milan, New Mexico. Completed plans call for site work for a water / sewer project; and for paving for a water / sewer project.
The Project includes the following Work: Base Bid: Installation of new sewage lift station with an appurtenant valve vault, approximately 115 linear feet of new 8-inch sewer force main, and approximately 120 linear feet of 10-inch gravity sewer main. The new lift station shall be equipped with new dual submersible pumps with new controls, piping, check valves, and floats. Extension of 3- phase power to the site is to be coordinated with Continental Electric Divide Electric Cooperative. The new gravity sewer main will connect to and extend from an existing sewer line, and feature two (2) new manholes. Installation of the new force main includes a new pressurized cleanout and the connection to an existing force main to connect the new lift station to the Village's municipal sewage collection system Additive Alternate 1: Construction will include extending potable water facilities to the new lift station site through the installation of approximately 145 linear of 2" PVC water line and 25 linear feet of 1" copper service line. The new 2" water line will: connect (tap) an existing water main, will feature a new 2" gate valve, and be capped at the line's termination point, as shown in the construction drawings. The new 1" water service line will extend from the new 2" water line and which will feature a new frost proof hydrant and new water meter to service and measure the sanitary water use at the new lift station facility. Additive Alternative 2: Construction will include lining the interior concrete surfaces of the new lift station with a corrosion resistant polyurethane coating. Additive Alternative 3: The new control panel for the new lift station will be equipped with SCADA hardware equipment to allow the new lift station to be incorporated onto a future SCADA System that is being developed under a separate upcoming project. Additive Alternative 4: Construction will include installing gravel covering over the area designated for the new lift station site, as well as approximately 100 linear feet of new perimeter chain link fencing to enclose and secure the new lift station facilities. The new perimeter fence will feature a height of 8-feet and a drivable access gate. Additive Alternative 5: Construction will include the abandonment of the existing Stanley Lift Station vaults, including the existing wet well, dry pump vault, and control panel. The salvageable mechanical equipment featured in the existing lift station vaults shall be removed, recovered, and supplied to the Village, prior to demolishing the underground vaults. Additive Alterative 6: Construction will include equipping the 8-inch sewer force main with a new 8" pressure cleanout. Bids are requested for the following Contract: Milan Stanley Lift Station Replacement The Project has an expected duration of 120 days. Your name, company name, phone number, and email address will then be added to the Plan Holders List for this project. It is the Contractor's responsibility to obtain all amendments/addenda from the website prior to the bid opening. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including addenda, if any, obtained from sources other than the issuing office. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Genna M. Slape, genna.slape@wilsonco.com
Post-Bid
Water / Sewer
$250,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 12, 2023
May 12, 2023
To Be Determined, Milan, NM
Related To This Project
Milan, NM
Bid Date: Jul 27 2023
Milan, NM
Bid Date: Jul 05 2023
Milan, NM
Bid Date: Jan 09 2024
Milan, NM
Bid Date: Apr 25 2024
Milan, NM
Bid Date: May 15 2024
Milan, NM
Bid Date: May 30 2024
Milan, NM
Bid Date: Jul 07 2022
Milan, NM
Bid Date: Jun 16 2022
Milan, NM
Bid Date: Mar 22 2022
Las Vegas, NM
Bid Date: Mar 15 2023
Yatahey, NM
Bid Date: Jun 14 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.