BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 22, 2023 at 8:00 PM

Updated January 26, 2024

Site work and renovation of a mixed-use development in Westminster, Massachusetts. Completed plans call for the renovation of a playground / park / athletic field; and for site work for a playground / park / athletic field.

The Town of Westminster seeks estimates from Design/Build Firms for the creation of pathways and spaces for a new garden and public space located at 62 Leominster St/Finnish Farmers CoOp Building/Grounds. The Westminster Finnish Farmer Co-op Garden will serve many purposes. With its visible location, the garden will first serve as a gateway into the "village" of Westminster from the eastern side of town. As a collaborative effort between many boards, committees and groups, the garden will provide an opportunity to teach visitors both young and old about the history of Westminster, about plants that we can grow, eat and utilize while simultaneously serving as a pollinator friendly space. As such, the garden will include areas for teaching, relaxation, and fellowship along with numerous areas for gardens of all types, shapes and sizes Phase one of the garden project is to establish the path system throughout the garden that includes an area for a water feature, an outdoor classroom and a fire pit. The grounds will be cleared of brush, unwanted trees and stumps but will require some site work to be level enough for ADA accessibility without impeding the natural slope of the land. It's imperative the pathways in the garden be ADA compliant to the greatest extent possible while meandering and not "fussy." The historic Finnish Farmers Co-op building is on the site and will play an integral part in the garden; the design should reflect that connection An area for pull in parking that will be ADA accessible and accommodate 2 cars, and a gravel pull-in lot along Leominster Street are to be included in phase one. Please note: No asphalt will be allowed in parking areas or pathways to avoid contamination from runoff. 1. Design Submission Due April 14, 2023 2. Site Work/Ground Leveling May 6, 2023 3. Feature Installation May 22, 2023 4. Final Walkthrough June 1, 2023

Post-Bid

Playgrounds / Parks / Athletic Fields

$15,000.00

Public - City

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
635
Active Projects
250
Bidding Soon
4,673
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2023

May 1, 2023

Project location map

62 Leominster St, Westminster, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.