EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 15, 2023 at 8:00 PM

Updated October 1, 2024

Site work for a sidewalk / parking lot in New Haven, Connecticut. Design plans call for site work for a sidewalk / parking lot.

As of September 15, 2023, an engineer has been selected and this project is in the design phase. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: Design Services for the Development and Implementation of a New On-Street Bus Rapid Transit System Within the CTTransit New Haven Division The Connecticut Department of Transportation (Department) is seeking to engage one (1) firm to provide design services for the development and implementation of a new on-street bus rapid transit system within the CTtransit New Haven Division. This project will take place along some of the most heavily travelled transit corridors within sections of New Haven, Hamden, and West Haven. The project includes the procurement and deployment of battery electric buses (BEB), the construction of several on-street bus rapid transit stops and mini-hubs, as well as the completion of various other transit, roadway, traffic, intersection, state of good repair, safety, bicycle, pedestrian, ADA, and intelligent transportation system (ITS) improvements The method of Contractor Selection has not been Determined at this time

Design

Sidewalks / Parking Lot

$12,000,000.00

Public - State/Provincial

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements
Division 10 - Specialties

Division 10 - Specialties

Storage Specialties, Lockers, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
535
Active Projects
322
Bidding Soon
4,736
All Active Projects
2,151
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 19, 2024

img_map_placeholder

Multiple Locations, New Haven, CT

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Development and Implementation of a New On-Street Bus Rapid Transit System - Connecticut Department of Transportation

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.