BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a theater / auditorium in New Paltz, New York. Working plans call for the renovation of a theater / auditorium.

The scope of work for this project consists of providing and installing new motorized solar and blackout shade system at various window locations in the Old Main Building at Studley Theater. The main features of the work shall include, but are not limited to the following: Major work includes: Removing all existing window metal shade brackets at head of top section of window units, all rope cleat supports, and any other item that is in the way of installing new shades and materials. Providing and installing new quiet motorized dual motor roller shade systems with power panels, electronic drive rollers, blackout and solar shades mounted in double shade bracket design (holds 2 shades in one bracket) with removable fascia, room darkening side channels, wireless control switches and remotes, as shown on the drawings, as stated in the specifications, and as per the written and published product data specifications and written installation instructions by the manufacturer Mecho Shade Systems, LLC which is the basis-of-design or college "approved equal". Programming shall also be considered part of the work. Providing and installing all new surface mounted wire mold raceway, Series 2400D low profile dual channel raceway for power and low voltage cable in color ivory with all required bases, covers, internal and external elbows, clips, fittings, couplings, and device boxes; including all new wiring and low voltage cable by an electrical contractor as coordinated with the new motorized shades and electrical specification. All new surface mounted raceway to be run from each new motorized shade motors vertically at windows, then to be run horizontally on top of existing molding just below lowest existing windows and at top of existing wallboard paneling to new wireless control switches (one at each side of stage) and as close as possible to proscenium opening. Power for new shades to come from power panel "LPT1" located in Lighting Control/Dimmer System room above stage area. New wireless control switches with remote device shall be programmed to operate solar shades separate from blackout shade with option to control solar and blackout shades at same time, and independently at each side of stage or room. Providing and coordination of required scaffolding with adjustable leveling legs or casters that will not damage existing folding chair seating and sloping flooring at auditorium and balcony levels during the work. Flooring slopes down toward stage from theater lobby entrance into auditorium. Contractor shall be advised that: At front of existing theater near stage, the top window head height is approximately 28'-0" above finish flooring, but Contractor to understand this information is provided for informational purposes and is to be field verified by Contractor. College not responsible for Contractor failure to verify. There will be ongoing work at the exterior stairs and building entries at Studley Theater during this project and shall make accommodations to provide and maintain full access and coordination with building occupants and other contractors as needed. The project site will be unavailable from July 12, 2023 to August 2, 2023 to allow Piano Summer Events to occur. Currently the known event dates for Piano Summer are July 15th, 22nd, and the 28th though these exact dates may be subject to change. Therefore, Contractor to ensure project site is free of any work materials and cleaned to a ready to use condition without the need for further cleaning. Contractor shall provide and maintain full access and egress in and out of building entry locations, residence halls, classrooms, offices, non-work areas, and specifically at the Old Main Building. Contractor, Contractors employees, and all sub-contractors to Contractor shall park employee vehicle(s) in the College approved location during all times of work, and each contractor and sub-contractor employee shall purchase a contractor parking hang tag for the duration of the work period, no exceptions. Providing all labor, supervision, project coordination, tools, equipment, demolition, legal removals, and the legal recycling, disposal, and reporting of all construction waste for the renovation of the work. Contractor shall be fully responsible to review all existing conditions, all dimensions, all material quantities necessary, and all new work indicated or shown; and as fully coordinated with all construction documents and specifications prior to bidding. Contractor shall provide daily project clean-up of debris created by the Work, restoration of existing adjacent areas disturbed by this contract work, and final cleaning of all areas of the completed Work. All work shall be completed in accord with applicable manufacturer's materials standards; applicable NYSDOT Standards, NY State Building Code requirements, and applicable Federal & State regulation. As it pertains to the Work, Contractor shall follow and adhere to the Campus Impairment Program, and especially regarding any welding work, and Contractor shall not disrupt the existing campus fire alarm system during the work, no exceptions. Contractor shall provide temporary fencing as stated in the General Requirements Section D - Special Conditions, line 4 "Staging Area/Storing of Materials, and Construction Fencing". All dumpsters and storage trailers shall have solid wood members placed under wheels of these items to protect existing conditions, and dumpsters shall be placed on asphalt paving, unless approved in advance by college. Locations of these items must also be approved by college before any deliveries or installation, no exception. Contractor shall leave work area in a ready to use condition without the College having to clean any areas of work where Contractor performed work. The project shall commence upon award of contract, but actual construction shall not begin until after Commencement or until June 1, 2023 with Completion of all construction Work no later than the First day of Classes or by August 25, 2023. An additional 30 days will be added beyond the construction work period to allow for administrative paperwork, such applications for payment and closeout materials. Complete sets of Contract Documents for bidding may be obtained from Elissa E. Greene, Contract Administrator, SUNY New Paltz, Design & Construction Department, Service Building, 1 Hawk Drive, New Paltz, NY, 12561-2443. 845 257-3309 or via email greenee@newpaltz.edu. Bids must be submitted in duplicate in accordance with the instructions contained in the Information for Bidders. A Bid Security will be required for each bid in an amount not less than five (5) percent of the Total Bid. It is the policy of the State of New York and the State University of New York to encourage minority and women-owned business enterprise participation in this project by contractors, subcontractors and suppliers, and all bidders are expected to cooperate in implementing this policy. The State University of New York reserves the right to reject any or all bids. Contractor should arrive early so that you can purchase a parking ticket. All visitors who park on the SUNY New Paltz campus must display a valid Visitor Parking Permit on the vehicle's dashboard or hanging from the rear view mirror, Monday - Friday between 6:30 am - 6:30 pm. Visitor permits are $3.00 and can be obtained from the Welcome Center in the Haggerty Administration lobby and the Parking Office in HAB 35 Monday-Friday 8:30 am - 5 pm (summer hours: 8:00 am - 4:00 pm). Park & Pay machines are located in the entrance of Rt. 32 Lot #28, West entrance located on Hawk drive, off Rt. 208 and Lot 5 adjacent to Parker Theater. A Visitor Permit is valid for the date of purchase only. (View our campus map.) Day passes purchased from the Park & Pay machines are date-stamped for 24 hours from purchase time. They must be purchased each day if necessary and cannot be pre-brought. Visitor permits allow visitors to park in any lot on campus EXCEPT for resident student lots. Overnight visitor parking is allowed ONLY in Route 32 Lot (lot 28) or Wallkill Lot (lot 30). Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 24% Women Owned Sub-Contracting Goal: 6% Service-Disabled Veteran-Owned Business Contracting Goal: 6%

Final Planning

Theaters / Auditoriums

$100,000.00

Public - State/Provincial

Renovation

15

15

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
416
Active Projects
231
Bidding Soon
3,937
All Active Projects
1,773
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 6, 2023

June 1, 2023

img_map_placeholder

1 Hawk Hill Rd, New Paltz, NY

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.