BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a mixed-use development in Deerfield, Ohio. Completed plans call for the construction of a water / sewer project; for site work for a water / sewer project; for the demolition of a water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Berlin Lake Mill Creek Recreation Area Oak Pump Station Replacement and Collection System Rehabilitation Project, Berlin Lake, Mahoning County, Ohio - The U.S. Army Corps of Engineers, Pittsburgh District, is carrying out a project to replace the existing Oak Pump Station and to rehabilitate portions of the existing sanitary sewer collection system at the location referenced above. The major features of the Project generally involves the following:a. Demolition and proper disposal of the existing Oak Pump Station and installation of a new, pre-packaged commercially available submersible duplex pump station.o The existing station has tested positive for lead coatings.o The new station, appurtenances, and connections will be constructed in the same location as the existing station.o An Ohio Permit-to-Install (PTI) permit is being secured by the Government for the new station and the contractor will have to comply with any requirements of the permit.b. A gravel driveway for station access and a security fence.c. Lining and repair rehabilitation work of portions of the existing sanitary sewer collection system. This affects approximately 10 manholes and 2,000 feet of 6 to 8-inch sewers.o Asbestos containing materials are presumed to be present in all or portions of the existing pipes.The work is to be performed entirely on Government property which consists of a public campground and two USACE field offices. The campground is open from mid-May to mid-September, while the two USACE field offices are open year-round.Project physical construction is proposed to take place in the campground off-season period between September 2023 and May 2024. This would allow the Contractor to perform construction with no interaction with the campground users.Disposal of construction waste material will be disposed of at commercially permitted facilities licensed to accept waste or recyclable materials as applicable.Construction work will occur in close proximity to flood mitigation and recreation areas. The existing facilities are currently operated and staffed by Government personnel 24 hours a day 365 days of the year.Seasonal recreation requires the water tank to be in operation Memorial Day (May 09, 2023) through Labor Day (September 05, 2023). All shutdowns are to be coordinated with the Contracting Officer or designated representative. W81ET431149822 Magnitude of Construction is Betw een $1,000,000.00 and $5,000,000.00

Award

Water / Sewer

$1,249,758.00

Public - Federal

Demolition, New Construction, Paving, Site Work

28

18

6

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
288
Active Projects
176
Bidding Soon
2,662
All Active Projects
1,146
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 6, 2023

September 5, 2023

September 4, 2024

img_map_placeholder

2030 Bonner Rd, Deerfield, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.