BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Barnstable, Massachusetts. Completed plans call for the renovation of a water / sewer project.

Bid date extended from March 29,2023 to April 5,2023 10,000 Gallon Fiberglass Underground Storage Tank Removal at Former Cotuit Elementary School. This legal ad is to comply with the quote process $10k-$10K allowed under M.G.L. c. 149/30, 39M Underground double hulled storage tank, 10K gallons, fiberglass. Veeder root monitoring system. Tank has been emptied. For any questions, please call Procurement Office, Amber Patterson, 508-862-4742, or email Amber.Patterson@town.barnstable.ma.us Vendor will provide equipment and manpower sufficient to remove a 10,000 gallon fiberglass underground storage fuel tank located at 140 Old Oyster Road in Cotuit Massachusetts. Removal will include the tank, immediate piping from the tank to the edge of the foundation, manhole covers and access flanges, and disturbed pavement. Once the tank is removed, a certified LSP, hired by the owner, will certify the removal as being "clean" and free from any evidence of leakage that would be classified as contamination. The construction vendor will take and dispose of the tank and any piping associated with the tank. Certified clean fill will be provided by the contractor and placed into the depression previously occupied by the Tank, and will smooth the ground to be level with the remaining pavement. If contamination or evidence of a release is found, work shall immediately cease, and notification shall be made by owners representative to the DEP for further direction and investigation. Notifications of any release will also be made to the Cotuit fire department and the Town of Barnstable Board of Health. The tank removal vendor will be responsible for contacting Dig Safe for an inspection prior to the tank removal. They will also be required to hire a utility locator service to locate any utilities in the general area of the construction. The contractor must comply with all Federal, State and Local regulations regarding contaminated soil removal if any are found at the site associated with this tank removal. This item of work includes the following: . Removal of one underground storage tanks (USTs), and the related appurtenances, as follows: Tank #1 - One 10,000 gallon UST storing #2 Heating oil

Award

Water / Sewer

$16,800.00

Public - City

Renovation

3

5

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
433
Active Projects
265
Bidding Soon
3,187
All Active Projects
1,360
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 5, 2023

April 24, 2023

June 13, 2023

img_map_placeholder

140 Old Oyster Rd, Barnstable, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.