Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, paving, new construction, renovation and addition to a mixed-use development in Fitchburg, Massachusetts. Completed plans call for the addition of a 25,300-square-foot, two-story above grade library; for the demolition of a library; for the construction of a library; for the renovation of a 29,700-square-foot library; for site work for a library; sidewalk / parking lot; and for paving for a sidewalk / parking lot.
This project is for the comprehensive renovation and expansion of the Fitchburg Public Library. The building is a contributing building Monument Park Historic District in downtown Fitchburg with 2 ears of construction , 1965 and 1949. Complete removal of parts of the existing building will be required, including the 1949 section in its entirety and the bookmobile garage section of the 1965 construction. The portion of the building that will remain is of concrete construction comprised of cast-in-place elements, precast concrete floor planks and post-tensioned concrete. The addition will be steel framed with composite deck. The new construction is approximately 25,300SF and the existing historic portion to remain is approximately 29,700SF. New building systems will be incorporated throughout, but there are also items of interior and exterior architecture and site elements that will be preserved and maintained. The work is estimated to cost $30,000,000.00. Project Number - 1813.00 https://www.sentinelandenterprise.com/2023/06/30/fitchburg-library-receives-additional-1-5-million-in-expansion-project-funding/ June 30, 2023 FITCHBURG - The Fitchburg Public Library (FPL) will receive approximately $1.5 million in additional funding from the Massachusetts Board of Library Commissioners (MBLC) for its upcoming expansion project, which will help offset rising construction and labor costs. The funding, which supplements the $12.5 million total grant award from the MBLC through the Massachusetts Library Construction Program, will support the $40 million renovation, modernization, and expansion of the library that is expected to begin later this year. The additional MBLC funding offsets the city's financial contribution to the project, which was $12 million but is now $10.5 million. Ten libraries in the state were awarded additional funding as a result of adding 15% to the total eligible cost used to calculate the current grant. "As one of only 10 other libraries receiving this additional funding throughout the Commonwealth, we are grateful to the Massachusetts Board of Library Commissioners and our local legislators for seeing the value our renovation and construction project will bring to the community," said FPL Executive Director Deb Hinkle in a news release. "We appreciate the MBLC's continued support to ensure our library will remain sustainable for years to come. We are also grateful to State Senator John Cronin and State Representative Michael Kushmerek for working alongside other Massachusetts legislators to advocate for this additional funding." Founded in 1859 and home to one of the first children's rooms in the country, the library is a centerpiece on Main Street, providing generations the opportunity to experience programming and services that open a world of learning. Besides books, media, and other circulation materials available, the library offers discounted passes to area museums and such, children's programming, internet and computers, printing and copying, historical and cultural heritage preservation, and more. "The Massachusetts Public Library Construction Program is pleased to partner with local communities, like Fitchburg, using state funding to make building and renovating libraries possible," MBLC Director James Lonergan said in the release. "In the 35 years since the program's inception and the more than 200 communities that have benefited from it, we have not encountered circumstances like those brought on by the pandemic. The additional funding recognizes those circumstances and further supports Fitchburg's project which will bring economic, social, cultural, and educational opportunities to every resident of the community." _______________________________________ Addition and renovation to the existing Fitchburg Public Library building, and partial demolition of the existing Library Estimated Project Duration: 18 months
Bid Results
Library
$25,535,000.00
Public - City
Addition, Demolition, New Construction, Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Sign-up for Instant Access.
Provide your information to unlock 5 active projects and companies from our commercial construction database. Free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
September 13, 2023
October 16, 2023
March 7, 2025
610 Main St, Fitchburg, MA
Related To This Project
Fitchburg, MA
Bid Date: May 17 2023
Fitchburg, MA
--
Fitchburg, MA
--
Fitchburg, MA
Bid Date: Apr 12 2023
Fitchburg, MA
Bid Date: Apr 20 2023
Fitchburg, MA
Bid Date: Apr 28 2023
Fitchburg, MA
Bid Date: Apr 25 2023
Fitchburg, MA
Bid Date: Apr 20 2023
Fitchburg, MA
Bid Date: Mar 15 2023
Fitchburg, MA
Bid Date: Mar 29 2023
Fitchburg, MA
Bid Date: Mar 29 2023
Fitchburg, MA
Bid Date: Mar 30 2023
Fitchburg, MA
Bid Date: Mar 01 2023
Fitchburg, MA
Bid Date: Mar 16 2023
Fitchburg, MA
Bid Date: Mar 08 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--