Renovation of a water / sewer project in Youngstown, Ohio. Completed plans call for the renovation of a water / sewer project.

Electrical Installation/Construction, Electrical Regulating Chamber 104- Contract B WWTP Load Bank improvements Installation of provide and install a 2.5MW medium voltage load bank for generator testing. Work includes concrete pad surrounding asphalt conduit and wire installation. Representatives of Owner and Engineer will be present at the pre-bid conference to discuss the Project. Bidders are encouraged to attend and participate in the conference. Engineer will transmit to all prospective Bidders of record such Addenda as Engineer considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective. All questions about the meaning or intent of the Bidding Documents shall be submitted to Engineer in writing. To receive consideration, questions must be received by Engineer at least seven days prior to the date for the opening of Bids, unless longer period is indicated elsewhere in these Instructions to Bidders for certain types of requests, such as regarding substitutes and "or-equals" (when allowed during bidding). Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda transmitted or delivered to each entity recorded as having received the Bidding Documents from the Issuing Office, for receipt not later than three days prior to the date for the opening of Bids. Addenda may be issued after the stated period and before the receipt of Bids to change the date or time for receipt of Bids, or to make minor changes or clarifications to the Bidding Documents that will not have a significant effect on price. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

Award

Water / Sewer

$521,253.00

Public - City

Renovation

36

19

17

8

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Use of Site, Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Reference Standards, Temporary Facilities and Controls, Temporary Controls, Temporary Environmental Controls, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Construction Layout, Execution, Application, Erection, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Bonds, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Signage
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Medium-Voltage Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Identification for Electrical Systems, Commissioning of Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Rigid Paving, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Electrical Utilities, Site Grounding
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
212
Active Projects
153
Bidding Soon
1,418
All Active Projects
692
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2023

June 13, 2023

img_map_placeholder

Multiple Locations, Youngstown, OH

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Wastewater Treatment Plant (WWTP) Regulating Chamber 104 Contract B - (WWTP) Electrical Load Bank

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.