Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 7, 2023 at 7:00 PM
Updated November 15, 2023
Site work for an educational facility in Midland, Michigan. Completed plans call for site work for a educational facility.
SCOPE: The scope of work must include but is not limited to: removing fencing, and replacing with new fencing per drawings. Contractors Qualifications Contractor must have five years of experience in fence installation with 25 jobs or more of similar or larger size over the past five years. If the successful contractor has not performed services for the district in the previous three years, they must submit a reference list including contact names and phone numbers. Guarantee 1. All supplies materials and equipment used in the performance of the bid shall be of the type and quality used in commercial chain-link fence replacement services 9 gauge x 2" mesh. 2. Post spacing shall be spaced a maximum of 10'0" on center, Terminal spans may be less in order to adjust line spans or even footage. 3. Post Settings - all end & gate posts shall be set in concrete to the appropriate frost line depth with a belled bottom and concrete kept 3" below grade for backfill material; all line posts shall be driven unless approved by District. HF40 round tube/pipe should be used. 4. Fittings - all fittings and hardware shall be steel and of commercial grade/appropriate for use with zinc coated steel fabric or as appropriate if other fabric is specified. 5. Fabric Ties - steel fabric ties must be utilized in all applications unless approved by District. 6. Fence Removal - when removing fence posts the Contractor shall completely move the post and any concrete and completely fill and compact the holes with appropriate soil so that the area is level with the adjacent ground/surface. The Contractor shall not fill the post holes with the concrete removed from the old posts. 7. Backstops should match the width of the original and have a height of 20' with a full 6' canopy when specified. The backstop should be 6 gauge galvanized and the top section 9 gauge galvanized. 8. Safety capping on replaced fencing should be replaced with new to match existing.
Award
Educational
$154,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 25, 2023
October 25, 2023
1400 Rodd St, Midland, MI
Related To This Project
Midland, MI
Bid Date: Mar 28 2023
Midland, MI
Bid Date: Mar 28 2023
Midland, MI
--
Midland, MI
Bid Date: May 05 2023
Midland, MI
Bid Date: Apr 17 2023
Midland, MI
Bid Date: Apr 18 2023
Midland, MI
Bid Date: Apr 11 2023
Midland, MI
Bid Date: May 09 2023
Midland, MI
Bid Date: Mar 07 2023
Midland, MI
Bid Date: Mar 07 2023
Midland, MI
--
Midland, MI
Bid Date: Mar 03 2023
Midland, MI
Bid Date: Mar 02 2023
Midland, MI
Bid Date: Feb 23 2023
Midland, MI
Bid Date: Mar 20 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
