BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 13, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a bridge / tunnel in Arlington, Virginia. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Project was awarded to Fort Myer Construction Inc in the amount of $5,572,536.46. This work shall consist of removing sidewalks and incidental concrete items including, but not limited to, entrances, median strips, curbs, and combination curb and gutters, for the purpose of replacement or other construction in accordance with this provision and in conformity with lines, grades, and limits established by the Engineer. DBE Requirement: 5%

Award

Bridges / Tunnels

$5,572,536.00

Public - State/Provincial

Paving, Site Work

122

6

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
449
Active Projects
114
Bidding Soon
3,011
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 26, 2023

May 26, 2023

Project location map

N Abingdon St, Arlington, VA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.