BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 8, 2023 at 8:00 PM

Updated January 26, 2024

Site work, paving and new construction of a mixed-use development in Fort Yates, North Dakota. Completed plans call for the construction of a transportation facility; for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Standing Rock Airport, Fort Yates, ND - 2021 AD Building Major components of the Work include: Site work Construction of a new A/D building Construction of sidewalk Construction of septic system Construction of water service Utility connections A Pre-bid Conference will not be held. Direct all questions to the Engineer five (5) days prior to opening of bids: Sarah Mattes 320.333.8353 smattes@sehinc.com Bidders on this work will be required to comply with the Disadvantaged Business Enterprise (DBE) good faith effort requirements of 29 Code of Federal Regulations Part 26.53. The goal for DBE set by the North Dakota Aeronautics Commission & North Dakota General Aviation Airports is 3.47% of the total dollar value of the project. Bidders on this work will be required to comply with the Tribal Equal Rights Office Ordinance No. 165. The requirements of the bidders and contractors, as well as the TERO Fee, under this order are explained in the specifications. Bid security in the amount of 5 percent of the Bid must accompany each Bid in accordance with the Instructions to Bidders. The successful Bidder will be required to provide Performance and Payment Bonds of 100 percent of bid amount. Contractors may be requested to submit "Contractor's Qualification Statement". The Standing Rock Sioux Tribe reserves the right to reject any and all Bids, to waive irregularities and informalities therein and to award the Contract in the best interests of the Tribe. The DBE goal for this project is 3.47%. Goals for minority participation for each trade 1.3% Goals for female participation in each trade 6.9%

Bid Results

Transportation Terminals

$562,315.00

Public - Federal

New Construction, Paving, Site Work

27

29

10

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
5
Bidding Soon
147
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 3, 2023

July 3, 2023

Project location map

Standing Rock Airport, Fort Yates, ND

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.