EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 20, 2023 at 7:00 PM

Updated October 1, 2024

Demolition, site work and addition to a fire / police facility in Lexington, Illinois. Completed plans call for the addition of a 4,200-square-foot, one-story above grade fire / police facility; for the demolition of a fire / police facility; and for site work for a fire / police facility.

As of December 20, 2023, this project has not yet been awarded. A timeline for award has not yet been established. The proposed project consists of the construction of an approximate 4,200 square foot, single-story, wood building addition attached to Lexington Community Fire Protection District Fire Station located at 102 S. Benson St., Lexington, Illinois. All questions regarding the drawings or specifications are to be forwarded to: JeffHaley - Hark Group, Inc. 363 S. Main St. - Suite 308 Decatur, Illinois 62523 E-mail: jhaley@harkgroup.com Phone: (217) 422-9330 All questions regarding site visits are to be forwarded to: Fire ChiefJason Birkenbeil 102 S. Benson St. Lexington, Illinois 61753 E-mail: Jason.Birkenbeil@lexingtonfd.com Phone: (309) 365-8703. Question Deadline 12/03/2023 Direct questions to Architect in writing

Bid Results

Fire / Police

$966,000.00

Public - City

Addition, Demolition, Site Work

28

6

2

4

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 10 - Specialties

Division 10 - Specialties

Storage Specialties, Lockers
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Equipment, Domestic Water Filtration Equipment
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Low-Voltage Circuit Protective Devices, Fuses, Lighting, Exterior Lighting
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
82
Bidding Soon
881
All Active Projects
405
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2023

February 5, 2024

img_map_placeholder

102 S Benson St, Lexington, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Fire Station Addition - Lexington Community Fire Protection District

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.