BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Upper Makefield, Pennsylvania. Completed plans call for site work for a road / highway; and for paving for a road / highway.

This contract consists of a base bid and two (2) alternates. The base bid includes 3-foot tapered edge milling, base repair, milling adjustment (Beaumont Drive) asphalt tack coat, joint sealing, leveling, 1-1/2 inch WMA wearing course along Bailey Drive, Bakers Drive, Bankers Drive, Beaumont Drive, Dunkin Drive, Emerald Court, and Russel Court. Alternate #1, Upper Makefield Township Complex, includes full 1 1/2 depth milling, base repair, leveling course, asphalt tack coat, wearing course overlay and miscellaneous line striping. Alternate #2, Declaration Place, generally includes full 1 1/2 depth milling, base repair, and wearing course overlay. Asphalt materials shall be based on PennDOTs April 2023 Asphalt Cement Price Index. This contract consists of a base bid and two (2) alternates. The base bid includes 3-foot tapered edge milling, base repair, milling adjustment (Beaumont Drive) asphalt tack coat, joint sealing, leveling, 1- 1/2 inch WMA wearing course along Bailey Drive, Bakers Drive, Bankers Drive, Beaumont Drive, Dunkin Drive, Emerald Court and Russel Court. Alternate #1, Upper Makefield Township Complex, includes full 1 1/2 " depth milling, base repair, leveling course, asphalt tack coat, wearing course overlay and miscellaneous line striping. Alternate #2, Declaration Place, generally includes full 1 1/2 " depth milling, base repair, and wearing course overlay. CLARIFICATION DEADLINE 3/31/2023 8:00 AM Each bid shall be submitted in accordance with the Instructions to Bidders and must be accompanied by a Bid Bond or Certified Check for not less than ten percent (10%) of the Bid amount payable to the Township of Upper Makefield along with an Agreement of Surety certifying that the required Performance and Payment Bonds will be provided to the Bidder. The successful Bidder shall be required to furnish proof of insurance and bonds for Performance, Payment, and Maintenance in such form as meets the approval of the Township of Upper Makefield and having as security thereon such Surety company or companies as are approved by the Township of Upper Makefield. A pre-bid meeting will not be held for this project. This project is subject to applicable provisions of Act 422, Pennsylvania Prevailing Wage Act as amended and the prevailing minimum wage rates issued by the Pennsylvania Department of Labor and Industry. No Bidder may withdraw his bid within sixty (60) days after the date set for the opening of the bids. The Township of Upper Makefield reserves the right to reject any and all bids for any cause whatsoever, to eliminate any item or items from the contract, and to waive any informality in the bids The Township of Upper Makefield reserves the right to increase or decrease any or all of the quantities of work or to omit any of them, as it may deem necessary and such increase or decrease of the quantities given for any of the items shall not be considered as sufficient grounds for granting an increase in the unit prices bid. The contractor will be paid at the unit prices bid for actual work performed in accordance with the terms of the contract. Bid shall be awarded to lowest bidder for combined base Bid and any Alternatives chosen by the Township.

Award

Roads / Highways

$662,620.00

Public - County

Paving, Site Work

5

18

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
436
Active Projects
217
Bidding Soon
4,220
All Active Projects
2,026
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 5, 2023

May 5, 2023

img_map_placeholder

Multiple Locations, Upper Makefield, PA

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.