BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Remodeling and addition to a fire / police facility in Hancock, Minnesota. Completed plans call for the addition of a fire / police facility; and for the remodel of a fire / police facility.

As of June 15, 2023, the project has been awarded and construction is expected to commence the week of July 3, 2023. Construction will be completed within one year of commencement. This project consists of the construction of an unsprinklered, 50'x60' wood-framed addition as well as a renovation to the existing Hancock Fire Hall and Community Center building. The addition will contain two additional fire truck parking bays, a hose tower, a training room, a compressor room, a toilet room, and an office. The renovation work within the existing portion of the building will include new toilet rooms and a new utility room. Please contact CES Imaging Repro Dept at (763) 560-9098 or (800) 831-8587 for pricing and if you have any questions. The term "responsible contractor" means a contractor as defined in Minnesota Statutes Section 16C.285, subdivision 3. Any prime contractor, subcontractor, or motor carrier that does not meet the minimum criteria or fails to comply with the verification requirements is not a responsible contractor and is not eligible to be awarded a construction contract for the project or to perform work on the project. A prime contractor, subcontractor, or motor carrier that makes a false statement under oath verifying compliance with the minimum criteria will be ineligible to be awarded a construction contract on the project and the submission of a false statement may result in termination of a contract awarded to a prime contractor, subcontractor, or motor carrier that submits the false statement. A prime contractor shall include in its verification of compliance a list of all of its first-tier subcontractors that it intends to retain for work on the project. Before execution of a construction contract, a prime contractor shall submit a supplemental verification under oath confirming that all subcontractors and motor carriers that the prime contractor intends to use to perform project work have verified to the prime contractor, through a signed statement under oath by an owner or officer, that they meet the minimum criteria for a responsible contractor. Bids may not be withdrawn within forty-five (45) days after the scheduled closing time for receiving bids without consent of the Owner. The Owner reserves the right to reject any and all bids and rebid the project until a satisfactory bid is received. No bid will be read or considered if the bid does not fully comply with the requirements of this invitation and/or other bidding and contract documents. Any deficient bid submitted will be returned to the bidder immediately. Work of this proposed Contract comprises building construction and remodeling, including general construction Work. Direct questions to Tom Aspelund, email; tom.aspelund@widseth.com. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Award

Fire / Police

$1,938,750.00

Public - City

Addition, Remodeling

50

26

16

7

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
11
Bidding Soon
225
All Active Projects
99
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 7, 2023

July 3, 2023

July 8, 2024

img_map_placeholder

662 6th St, Hancock, MN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.