BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 2, 2024 at 7:00 PM

Updated December 3, 2024

Site work for a water / sewer project in Malibu, California. Completed plans call for site work for a water / sewer project.

Las Flores Canyon Road Drainage Improvements This project consists of replacing an existing 24" CMP with 24" RCP, tying into an existing catch basin and manhole located on Las Flores Canyon Road next to Las Flores Creek Park. Completion Time: 20 Consecutive Working Days Liquidated Damages: A. Failure to complete work on time: $500.00 Per Calendar Day (Sec. 6-9.1) B. Failure to keep traffic lanes open: $500.00 Per Hour (Sec. 6-9.2)

Award

Water / Sewer

$80,075.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
399
Active Projects
182
Bidding Soon
3,060
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.