BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Green Cove Springs, Florida. Completed plans call for site work for a water / sewer project.

Clay County is seeking a licensed and qualified Contractor to remove and replace the damaged boat ramp dock at Governors Creek Boat Ramp located at 1973 Hwy 17, Green Cove Springs, FL 32043. Question Submission Deadline:March 27, 2023, 4:30pm Question Response Deadline:March 29, 2023, 4:30pm Work includes, but is not limited to obtaining all locates, permits, labor, inspections, hardware, equipment and providing all materials not specified in this Scope of Work, necessary to remove and replace the boat ramp dock, adjacent to boat ramp: Remove and replace all components of 5' x 50' dock; Install ten (10) new pilings; 10" EcoPile (8-16' length, 2-20' length end pilings); Sub-stringers to be 2x8 Wear Deck, attached with stainless steel through-bolts; New decking to be Tide Tamer Sure Step with aluminum framing, tan in color; Cleats to be installed every ten (10) feet; Bumpers to be attached on edge of decking. All applicable permits, fees, licenses and final County & municipality inspections, are the responsibility of and will be paid for by the successful Contractor. The successful Contractor shall comply with all applicable State and local laws, ordinances, codes, and regulations. Project is located within the City of Green Cove Springs limits. The successful Contractor shall obtain all applicable permits required by the City. The successful Contractor shall maintain a credible work force daily to insure progress of the job. The successful Contractor shall utilize the services of licensed, insured contractors and other craftsman knowledgeable of all phases as related to this project. The Contractor shall designate a foreman/superintendent who shall direct the work. An email address and cell number shall be provided upon receipt of notice to proceed. A superintendent or foreman shall be on the jobsite at all times when work is being performed. The successful Contractor shall supervise all workmanship, including that of all subcontractors, to ensure that it is of the highest grade and according to best standard practice. Any damage to existing utilities, building, finished surfaces, equipment, or public property or improvements, resulting from the Contractor's performance shall be repaired to the satisfaction of the County at the successful Contractor's sole expense. The repair or replacement work shall be of equal or greater quality and in appearance to prior condition. If damage caused by the successful Contractor has to be repaired or replaced by the County, the cost of such work shall be deducted from the monies due the successful Contractor. Excess materials, rubbish, garbage, debris, etc., generated shall be disposed of by the successful Contractor daily at the Contractor's own expense. All material is to be disposed of off-site in a safe and legal manner. The Contractor shall not stockpile debris, rubbish, garbage, excess materials or other unwanted materials on the sidewalk or on the street. Washing of excess materials into the storm drain is prohibited. Payment for transportation and disposal of excess materials and removed equipment shall be included in the Pricing Proposal, and no additional compensation shall be made. Contractor is responsible for verifying measurements. Contractor is responsible for disconnection and reconnection of attached electrical components. Contractor will notify the County Project Manager or designee at least 24 hours in advance to request an inspection or meeting. Contractor is responsible for Maintenance of Traffic during project which should include barricades and signs, as required. It is incumbent upon all Contractors to examine the site and ensure that they are aware of all conditions that may affect the completion of the project as required herein. The County will not be responsible for conclusions made by the Contractor. No claims for additional compensation will be considered on behalf of any Contractor, sub-contractor, materials suppliers or others on account of failure to be fully informed of all requirements of this bid and project site. The County will discuss all instances of unacceptable equipment and/or services with the awarded Contractor. This shall be immediately rectified by the Contractor at no charge to the County, to include any labor and materials as it may apply. During this time, the County may suspend service with the Contractor until the problem(s) are corrected or may elect to use another company on an emergency basis. A record of failure to perform or of an unsatisfactory performance may result in supplier debarment. Final completion shall be obtained within thirty (30) days from issuance of Notice to Proceed. The Contractor may request payment no more than once monthly, based on the amount of work done or completed. All partial estimates and payments found to be in error shall be subject to correction in the estimates and payments subsequent thereto, and in the final estimate and payment. Payments will be made in accordance with the Florida Local Government Prompt Payment Act. Workdays and hours - Normal work hours of Monday through Friday, 7:30 a.m. to 5:00 p.m. unless approved by Project Manager. Any work performed outside of the normal County business hours will require prior County approval and payment to the County for all expenses incurred by the County for overtime costs in accordance with the Clay County pay scale may be required. If the County and/or Contractor identifies any additional services to be provided by Contractor that are not covered under the Agreement but are beneficial to the County, such additional services shall be mutually negotiated between the County and the Contractor. A work performance evaluation will be conducted periodically to ensure compliance with the Contract. The Contractor shall provide a warranty for all workmanship and material for a period of two (2) years. Warranty will begin from the date of final acceptance. The Contractor shall be assessed Liquidated Damages (LD) of $50.00 for each day past final completion date set by the contract. If the Contractor fails to maintain acceptable product quality or to perform adequately in accordance with the terms, conditions and specifications established in the awarded Contract, the County reserves the right to cancel the Contract upon fifteen (15) days written notice to the Contractor. Bid shall be awarded based on the lowest responsive and responsible bid that best meet the needs of the County. Prices must remain valid for 90 days.

Award

Water / Sewer

$32,384.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
160
Active Projects
88
Bidding Soon
1,441
All Active Projects
566
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 31, 2023

May 1, 2023

img_map_placeholder

1973 Hwy 17, Green Cove Springs, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.