BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 4, 2025 at 7:00 PM

Updated February 5, 2025

Site work and paving for a bridge / tunnel in Bridgeport, Ohio. Conceptual plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Project ID: 117042 Work Category: Roadway Major Rehab Resurfacing project of State Route 7 will involve work within the village of Bellaire. Work will include replacement of the existing concrete pavement, center barrier replacement, lighting replacement, and drainage upgrades. No new right-of-way will be required to facilitate construction. No utility relocations are expected. As of February 4, 2025, this project is in the planning/development phase. Engineer information has not been determined. It is anticipated construction will start in spring 2028 and end in fall 2029.

Conceptual

Bridges / Tunnels

$31,900,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2028

Project location map

OH-7, Bridgeport, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.