BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a road / highway in Roseville, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Project has been awarded but award amount not confirmed. This is a new project. Project name: Ferrari Ranch Road Phase 2 and Oak Tree Lane North Solicitation no: 30650-300 Title: Ferrari Ranch Road Phase 2 & Oak Tree Lane North Project #: 30650-300 Description: Ferrari Ranch Road Phase II and Oak Tree Lane North (Esplanade at Turkey Creek, Taylor Morrison, Village 1.) Job walk is mandatory and is scheduled for March 23, 2023, at 9:00am. Attendees are to meet on-site at Ferrari Ranch Road Phase 1 terminus port near the barricade. Sealed bids shall be received at the office of: Frayji Design Group, Inc. 1316 Blue Oaks Blvd. Roseville, CA 95678 Project Manager: Tony Frayji - tfrayji@frayjidg.com Bid Date: 04-13-2023 2:00 pm PDT A mandatory pre-project meeting is scheduled for 03-23-2023 9:00 am PDT WORK WILL CONSIST OF UNDERGROUND INFRASTRUCTURE CONSTRUCTION AND ROADWAY CONSTRUCTION OF THE EXTENSION OF FERRARI RANCH ROAD AND A NEW CONSTRUCTION OF OAK TREE LANE NORTH. THE PROJECT WILL INCLUDE UNDERGROUND CONSTRUCTION OF STORM DRAINAGE, SANITARY SEWER, DOMESTIC WATER AND THE CONSTRUCTION OF THE ROADWAY, WHICH INCLUDES CURB/GUTTER AND SIDEWALK. PROJECT WILL ALSO INCLUDE ENCASEMENT OF A SECTION OF NEVADA IRRIGATION DISTRICT'S HEMPHILL CANAL. Earthwork/ cut to fill, sub-grade preparation, Dewatering, import or export as necessary to balance Oak Tree Lane and Ferrari Ranch Road right of way, excess material may be placed within the School/ MDR site on the NE corner of Oak Tree Lane and McBean Park Drive for future signal or as directed by the developer, provide all labor, equipment, materials & testing necessary to construct curbs, gutters, sidewalks, median curbs, storm drain pipes, manholes, culverts, D.I's, headwalls, & sewer manholes, pipes, water main pipes, valves, fire hydrants, signal substructure conduit, interconnect conduit, irrigation sleeves, roadside ditches, asphalt pavement, striping, streetlights, site erosion control, and per the SWPPP plans prepared by Holly McClure. The Contractor is to coordinate with the on-site subdivision contractor for connectivity and seamless construction. NID canal and piping shall be bid separately in accordance to the quantities provided. The work may be omitted from the job or constructed out of sequence. Landscaping: All islands and landscaping along the northwest side of Ferrari Ranch Road and the east side of Oak Tree Lane is included. Landscaping adjacent to the subdivision is excluded. RFI's must be submitted formally no later than March 31 st , 2023. A response to all RFI's will be provided within 48 hours to all bidders. All RFI's will be uploaded on and provided to all bidders via an external link.

Award

Roads / Highways

$800,000.00

Public - City

Paving, Site Work

73

3

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
71
Bidding Soon
1,321
All Active Projects
550
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2023

November 15, 2023

img_map_placeholder

Multiple Locations, Roseville, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.