BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Ypsilanti, Michigan. Completed plans call for site work for a transportation facility; for paving for a transportation facility; and water / sewer project.

Reference Number: 0000314422 The Wayne County Airport Authority (Airport Authority) is soliciting bids from general contractors, construction managers and other businesses for the Construct Taxiway A - Phase 2 (Project) at Willow Run Airport (YIP). This project includes work associated with construction of approximately 16,800 square yards of new taxiway Portland cement concrete pavement and 10,200 square yards of taxiway asphalt shoulder pavement with associated electrical, installation of approximately 2,100 lineal feet of storm sewer, earthwork, signs, and utility work in accordance with the drawings, specifications and other Contract Documents. It is anticipated that this Project will start construction in the spring of 2024, and be completed during the construction season of 2024, and be partially funded through the federal Airport Improvement Program (AIP). (The Contract resulting from this solicitation is subject to Davis-Bacon and Related Acts Wage Requirements.) Important Note: It is the responsibility of the Bidders to view, obtain or download all addenda issued by the Wayne County Airport Authority Airport Authority for this RFB. Question Acceptance Deadline: 04/03/2023 02:00 PM EDT Questions are submitted online: No Contact Information: Faye Northey 734-247-7900 faye.northey@wcaa.us Buyer's Requirements Participation Requirements Disadvantaged Business Enterprise (DBE) General Requirements Bid Deposit Required Certified Payroll Employee Background Checks Required Federally Funded Insurance Required License Required Prevailing Wage Required Safety Standards Plan Security Badges Bonding Requirements Bid Bond: 5 % Performance Bond: 100 % Labor and Materials Bond: 100 % Payment Bond: 100 %

Post-Bid

Transportation Terminals

$2,000,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
334
Active Projects
188
Bidding Soon
2,702
All Active Projects
1,058
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 28, 2023

June 23, 2023

img_map_placeholder

801 Willow Run Airport, Ypsilanti, MI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.