Site work for a water / sewer project in New Glasgow, Prince Edward Island. Completed plans call for site work for a water / sewer project.

This work includes the provision of all materials, labour, equipment, and ancillaries, as necessary for the completion of the work as indicated on the drawings and as described in the specifications and notes. Work on this section consists generally of, but not limited to, the following: Cavendish Beach: Realignment of existing steel frames and helical piles in the lower ramp section. Design, supply, and installation of helical piles and connection requirements at ramp locations. Supply and installation of new steel pile saddles, connection brackets, spindles and handrail components. Replacement of ramp and landing sections. There are two ramp sections and one landing section located adjacent to the existing stairs. The contractor will be permitted to salvage the stringer and deck system, but these sections will require new rail systems. Realignment of the lower ramp sections and intermediate landing. Reconstruction of the lower stairs rail system. Removal and disposal of existing timber components that cannot be salvaged. Rehabilitate disturbed areas to the satisfaction of the Departmental Representative. Clean up debris and construction waste to be disposed of off site. Brackley Beach: Design, supply, and installation of helical piles and connection requirements at existing timber bents. Supply and installation of new steel pile saddles, connection brackets, spindles and handrail components. Replacement of ramp and landing sections. There are four sections located at Gregors Lane. The contractor will be permitted to salvage the steel railing from these sections. Realignment of the lower ramp sections and intermediate landing. Reconstruction of the lower stairs rail system. Removal and disposal of existing timber components that cannot be salvaged, including sections at Gregors Lane. Rehabilitate disturbed areas to the satisfaction of the Departmental Representative. Clean up debris and construction waste to be disposed of offsite. This is the Stage Two of a two-stage solicitation process: the first stage was to evaluate the qualifications of all interested suppliers. The second stage (Stage Two) is to invite the qualified suppliers to provide a financial bid on the project based on the specifications and drawings. Only qualified suppliers to Stage 1 have been invited to bid. A list of pre-qualified bidders from Stage One will not be released.

Post-Bid

Water / Sewer

$600,000.00

Public - Federal

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
29
Bidding Soon
205
All Active Projects
93
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 6, 2023

May 29, 2023

img_map_placeholder

Multiple Locations, New Glasgow, PE

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.