BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving, outdoor lighting, remodeling and renovation of a mixed-use development in Moberly, Missouri. Completed plans call for site work for a water / sewer project; sidewalk / parking lot; for paving for a sidewalk / parking lot; for outdoor lighting for a road / highway; for the renovation of a residential development; and for the remodel of a residential development.

The exterior renovation will include the removal & replacement of all roofing, soffit, fascia, downspouts, & gutters; replacement of windows; minor brick repair & replacement; and the removal & replacement of the paint on the metal wall panels on the upper portion & East face of the Assembly Hall. Interior renovation will consist of complete gutting & remodel of the bathrooms & kitchen, painting all walls, removal & replacement of some flooring and some ceilings. Electrical system upgrades include all new electrical distribution & branch panels, new manual transfer switch, all new LED lighting, new receptacles/devices, new exterior parking lighting. Mechanical system upgrades include all new HVAC equipment & removal of un-operational equipment. Plumbing system upgrades include new hot water heaters & distribution piping to new restrooms & renovated kitchen area, and a new grease interceptor for food preparation. The drives, parking, sidewalks, street entrances, & some fencing will also be replaced and a storm drain system installed to direct water from the roof to the storm drain. The project has two alternates, removal of existing boiler and installation of a new generator. The Work consists of interior & exterior renovation of the Moberly Readiness Center, including replacement of roof, roof accessories, window, and MEP systems. Interior renovations will consist of remodeling the kitchen and bathrooms, painting all areas, and the replacement of some flooring and ceilings. Exterior work will include removal and repainting of all metal siding, and demolition and reinstallation of parking, sidewalks, some site drainage features - The Work includes TPO roof, aluminum windows, 2x stud walls w/ Gypsum, epoxy flooring, mechanical systems, electrical systems, plumbing fixtures, acoustic ceiling tile, paint, and site work. MBE 10%, WBE 10%, and SDVE 3% Completion- 170 working days

Award

Residential Subdivision

$2,132,000.00

Public - City

Outdoor Lighting, Paving, Remodeling, Renovation, Site Work

37

26

8

11

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
26
Bidding Soon
333
All Active Projects
144
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 20, 2023

May 22, 2023

img_map_placeholder

310 E McKinsey St, Moberly, MO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.