BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in Sacramento, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Responses delivered by hand, fax, telephone, e-mail, or any postal carrier will not be accepted. If bidder uploads a file to Sac County E bids, it is the bidder's responsibility to ensure the file is not corrupt or damaged. If County is unable to open an attachment because it is damaged, corrupt, infected, etc., it may disqualify bidder's submission. See this training guide for assistance in entering your online response. PROJECT DESCRIPTION: The work to be performed under this contract includes the furnishing of all labor, materials, equipment, and and other incidental work for: The work to be performed under this contract includes the furnishing of all labor, materials, equipment, and and other incidental work for the repair of deteriorated pavement sections, the placement of conventional asphalt concrete, the installation of American with Disabilities Act (ADA) curb ramps, striping, and other improvements necessary to complete the rehabilitation. BASIS FOR AWARD: The basis for award shall be base bid plus additives or deductive items as identified in the bid solicitation. CONTRACT INFORMATION: Contract Documents are contained herein and include: Notice to Contractors, the Sacramento County Standard Construction Specifications, the Special Provisions, the Bid Proposal form and any attachments, exhibits, drawings, addenda, and/or documents provided by the Project Manager that pertain to this project. 3. BID GUARANTEES Each bid must be submitted on the bid forms provided in the Contract Documents; however, if none are provided, the surety may issue on its own paper. Each bid must also be accompanied by security in the form of a bid bond issued by a corporate surety, a certified check or cashier's check payable to the Treasurer of Sacramento County, or cash for an amount not less than ten percent (10%) of the aggregate sum of the bid. 4. BONDS The successful bidder shall be required to execute a material and labor Payment Bond and Performance Bond, issued by a corporate surety, acceptable to the County of Sacramento, each for not less than one hundred percent (100%) of the contract price. Pursuant to Public Contract Code, section 22300, the Contractor may, at its own expense, substitute securities for any money being withheld by the County to ensure performance under this contract. The Contractor must notify the County of its intent to pursue this option prior to the issuance/execution of a contract. 5. LICENSE REQUIREMENTS Award of this contract requires a valid California contractor's license with the classification identified above. Public Contract Code, section 4104(a)(1), requires that any person making a bid must submit the name, location of the place of business, and the subcontractor's license number on the bid form. No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code, section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code, section 1725.5. 6. LABOR COMPLIANCE PROGRAM (FEDERAL FUNDING) All labor on the project shall be paid no less than the minimum wage rates as established by the U.S. Secretary of Labor or as determined by the Director of the California Department of Industrial Relations. The higher of the two rates will be paid in accordance with the following statutes: The Davis Bacon Act and related federal acts; or California Labor Code section 1770 et seq. Copies of the minimum wage rates established by the Secretary of the U.S. Department of Labor (www.wdol.gov) and the prevailing rate of per diem wages as determined by the Director of the California Department of Industrial Relations are on file at the office of the Labor Compliance Program, 9700 Goethe Road, Suite D, Sacramento, California 95827, and are available upon request. The County of Sacramento will not accept lower State wage rates not specifically included in the Federal Minimum Wage Decision. This includes (or other classifications based on hours of experience) or any other classification not appearing in the Federal Wage Decision. Where the Federal Wage Decision does not contain the State wage rate determination otherwise available for use by the Contractor and subcontractors, the Contractor and subcontractors shall pay not less than the Federal minimum wage rate which most closely approximates the duties of the employees in question. The County of Sacramento received final approval from the Director of the California Department of Industrial Relations to enforce a Labor Compliance Program effective March 15, 1994. All questions regarding this Labor Compliance Program and prevailing wage requirements should be directed to the office of Labor Compliance Program at 916-875-2711. This is a Construction project in accordance with Labor Code. Direct pre-bid questions to the Project Manager, Anthony Voo, via the Q&A tab in the portal. ALL PRE-BID QUESTIONS MUST BE SUBMITTED IN WRITING NO LATER THAN Friday, April 7, 2023, 4:30pm. Questions received after that time will not be answered. Responses will be by addenda to the bid documents. The Board reserves the right to reject any or all bids, to waive any informality in any bid, and to determine which bid, in their judgment, is the lowest responsive bid of a responsible Bidder.

Award

Sidewalks / Parking Lot

$5,310,782.00

Public - City

Paving, Site Work

43

12

48

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
84
Bidding Soon
1,619
All Active Projects
674
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 20, 2023

June 19, 2023

img_map_placeholder

Multiple Locations, Sacramento, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.