BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Tacoma, Washington. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Description of Work: This contract provides for the improvement of: Group 1 - Tule Lake Rd S from Spanaway Loop Rd S to Ainsworth Ave S. This work will remove and reconstruct existing non-compliant curb ramps and construct new curb ramps where none currently exist at the following locations: Tule Lake Rd S and Spanaway Loop Rd S Intersection, Tule Lake Rd S and Ainsworth Ave S Intersection. This work will also include reconstructing portions of existing noncompliant cement concrete sidewalk on the north and south sides of Tule Lake Rd S, reconstructing the asphalt concrete traffic island at the southeast corner of Tule Lake Rd S and Spanaway Loop Rd S intersection, and modifications to the existing traffic signal system. Group 2 - 136th St E from 99th Ave Ct E to 103rd Ave E. This work will remove and reconstruct existing non-compliant curb ramps and reconstruct portions of existing non-compliant cement concrete sidewalk on the north side of 136th St . This work will also include removing an existing driveway approach that is not in use and reconstructing cement concrete sidewalk with cement concrete traffic curb and gutter, and other work in accordance with and as described in the Plans and Specifications. Pierce County, in accordance with the provisions of Title VI of the Civil Rights Act of 1964, (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Cost Range: $500,000 to $800,000 Working Days: 40 Utility Relocation Window Days: 0 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Sidewalks / Parking Lot

$230,000.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

59 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
45
Bidding Soon
707
All Active Projects
249
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 12, 2023

May 12, 2023

img_map_placeholder

Multiple Locations, Tacoma, WA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.