BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Snowmass Village, Colorado. Completed plans call for site work for a road / highway.

Reference Number: 0000314035 The Town of Snowmass Village Public Works - Road Division annually contracts the placement of pavement marking twice a year once to its main roads and some arterial roadways. The first application is in May (Spring) and the second application is in early October (Fall). It is intended that this project will conform to the Town's aesthetic, and design specifications found below. Question Acceptance Deadline: 03/24/2023 05:00 PM EDT Questions are submitted online: No Contact Information: Anne Martens 970-923-5110 amartens@tosv.com Buyers Requirements General Requirements - Installation Required - Insurance Required Introduction The Town of Snowmass Village Public Works - Road Division annually contracts the placement of pavement marking twice a year once to its main roads and some arterial roadways. The first application is in May (Spring) and the second application is in early October (Fall). It is intended that this project will conform to the Town's aesthetic, and design specifications found below. Terms and Conditions 1. The contractor must apply pavement markings between May 14 and June 7, then again September 24through October 12, unless agreed upon date change by Town Public Works. Weather conditions can also be a time factor which can cause rescheduling. 2. Locations a. Main Roads - Brush Creek Road, Owl Creek Road, Highline, Divide and Carriageway Roads (Double Yellow centerline w/white edging lines). b. Arterial Roads - Pine Crest, Spruce Ridge, Two Creeks, Faraway, Ridge, Meadow, Sinclair, Snowmass Club Circle and Horse Ranch roads. (Double Yellow centerline) arterial roadways to be approved at time of application. 3. All personnel must wear type two traffic safety vests working in roadways. 4. All employees must wear the appropriate personal protection equipment. 5. All vehicles must be legal to use on public roadways or have sign off from town police. 6. Town Road Division will be responsible for sweeping roadways before the scheduled pavement marking will be applied. 7. The contractor shall notify contractor administrator on days applications are being applied. 8. Roadway marking must be coned off until paint is properly dried to ensure that tracking of paint will not occur. 9. All main roadways must be signed with advance warning of "Roadway Marking Being Applied". a. Advance warning signage is required meeting MUTCD standards. 10. Turn lane markings are included in this scope. 11. Before pavement marking can be applied to the pavement, the surface must be dry and temperatures of 50 degrees F and rising are mandatory. 12. Pavement Marking Materials Standard 708.05, or acceptable alternate. 13. The Contractor must have proper equipment to access and efficiently apply pavement marking meeting OHSA safety requirements. 14. Application rate of one gallon per one hundred square feet (.01 gal/sq. ft.) shall be utilized. 15. Thermal Plastic may be used but must be inlayed. 16. Work areas will be maintained in a safe, clean, and organized condition. 17. The Contractor shall provide to the Town the services defined in the Special Provisions, referenced and included herein, consistent with the Bid Schedule referenced and included herein. This references the following project within the Town: Road Striping 2023, pursuant to the pricing, representations, and acknowledgements stated in the Contractor's Bid Schedule dated ____ and pursuant to the Project Specifications included in the bid documents. 18. Such services shall include contracting for, coordinating, and scheduling other Contractors or sub-contractors as needed to accomplish the work described in the Special Provisions and the Bid Schedule, irrespective of whether the work performed by these subcontractors are explicitly identified within the proposal. 19. Safety Data Sheet for products you will be applying.

Post-Bid

Roads / Highways

$300,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
21
Active Projects
6
Bidding Soon
112
All Active Projects
46
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 30, 2023

May 15, 2023

img_map_placeholder

Multiple Locations, Snowmass Village, CO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.