BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Washington, Missouri. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Enclosed is a Request for Proposal (RFP) for District Paving, Asphalt Maintenance, Sealing and Striping for the School District of Washington. The responsive Proposal will comply with all federal, state and local regulations. Information regarding the services to be provided, information which must be submitted as part of the Proposal, and related details are included in the accompanying RFP. Companies are to submit one (1) original of their response to the RFP. Proposals shall be delivered in sealed envelopes clearly marked as indicated below. District Paving, Asphalt Maintenance, Sealing and Striping School District of Washington Attn: Christine Marquart 220 Locust Street Washington, MO 63090 SCOPE A. Furnish labor, equipment, material and services necessary to provide and install the following: 1) Drives and curbs 2) Parking areas 3) Turnarounds 4) Patch work 5) Pavement markings 6) Precast parking curbs 1.2 DRAY TICKETS A. Retain all dray tickets for rock and asphaltic concrete mixtures employed; submit to the owner for verification upon request. 1.3 APPROVAL OF SUBGRADE A. Inspect sub-grade prior to beginning this work and notify if sub-grade is not satisfactory. Commencing work shall be deemed as acceptance of responsibility for the condition of the sub-grade. 1.4 JOB CONDITIONS A. Weather Limitations: Apply bituminous prime and tack coats only when ambient temperature in shade is above 50 degrees F and when temperature has not been below 35 degrees F for twelve (12) hours immediately prior to application. Do not apply when base surface is wet or contains an excess of moisture which would prevent uniform distribution and required penetration. B. Construct asphaltic concrete surface course when atmospheric temperature is above 40 degrees F, when underlying base is dry, and when weather is not rainy. C. No work shall be performed on frozen or wet sub-grade earth or rock base. D. Grade Control: Establish and maintain required lines and grades, including crown and cross slopes, for each course during construction operations 1) Contractor shall be responsible for coordinating correct elevations of inlets, catch basins, manhole covers, and all recessed items within pavement surfaces. Contractor shall notify the Owner of any item installed by other trades which are unacceptable to meet the required elevation for proper finish pavement elevations installation. 2) Contractor shall review with the Owner prior to starting work, any finished pavement elevation which will not provide for proper or adequate pavement slope to facilitate surface water drainage. E. Traffic Control 1) Provide flagmen, barricades, warning signs, warning lights, etc. for traffic control, movement, and safety and to cause the least interruption of the work and public right-of-way where required. 2) Maintain vehicular and pedestrian traffic during paving operations, as required for other school activities. 3) Protection: Paving shall be barricaded so that it will not be used for at least thirty-six (36) hours after placement. Remove barricades at proper time. All communications by the Company concerning this RFP, including requests for additional information or clarification, must be directed to Jeff Solter, Director of Buildings & Grounds, via phone at (636) 231-2050 or via email at jeff.solter@sdowmo.org. The completion date is July 28, 2023. The Board of Education reserves the right to accept or reject any or all Proposals, to waive any irregularities, and to accept the Proposal that is in the best interest of the District. The District shall be held harmless for any failure to solicit proposals from potential firms Location of Project: Early Learning Center, 831 West Pride dr, Washington MO Washington West Elementary, 840 West Pride dr, Washington MO West Pride dr, Hwy 100 to 5th street, Washington MO Asphalt Crack fill, Sealcoat (1 coat squeegee and 1 coat spray), and restripe: All asphalt areas at the following locations, including playground areas and asphalt walkways. Asphalt repairs: Mill and patch 3 areas at a depth of 3" The areas are marked by the red squares on the map. NOTE: Summer school is in session from June 5th to June 30th. The work dates for this project are July 3rd to July 28th

Post-Bid

Roads / Highways

$625,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
204
Active Projects
118
Bidding Soon
1,547
All Active Projects
681
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 6, 2023

July 3, 2023

July 28, 2023

img_map_placeholder

Multiple Locations, Washington, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.