Site work for a water / sewer project in Gibraltar, Michigan. Completed plans call for site work for a water / sewer project.

**As of June 12 2023, the awarded contractor is ‘Bidigare Contractors” for an amount of $2,620,239.00. Construction is anticipated to start by late Fall. Question Deadline 05/01/2023 Request for Clarification/Information. Requests for clarification and/or interpretation ofthe Contract documents shall be addressed to C. E. Raines Company, in writing by the Contractor, no later than three (3) days prior to deadline for bids. Section I - M. Gibraltar Water Main Installation - from Conrail RR to W. Jefferson Ave.: Remove approx. 50 square yards of existing pavement; Approx. 375 feet of Flowable Fill between casing and proposed water main pipe. Plug and Seal both ends of casing; Construct approx. 50 square yards of 10 inch non-reinforced concrete pavement w/integral straight curb, MDOT Grade P1, on new 9 inch MDOT 21AA Crushed Limestone Base. Construct approx. 50 square yards of 2 inch HMA Wearing Course, 5E10 Super Pave on top of the 10 inch Concrete; (2) Connections to exist. 12 inch Water Mains; Install approx. 125 feet of DI Water main via excavation method, 6 inch in dia.; Install approx. 400 feet of DI Water main via excavation method, 12 inch in dia.; Install approx. 2,900 feet of 12 inch Fusible PVC C900, DR18 via directional Drilling; Insert approx. 375 feet of DI Water main inside the 24 inch Steel Casing.; Jack & Bore Approx. 275 feet of 24 inch Steel Casing, 7/16 inch thick, #16 Gauge; Jack & Bore Approx. 100 feet of 24 inch Steel Casing, 3/8 inch thick, #16 Gauge; Install (6) 12 inch valve in 6 ft dia. Well; Install (7), 2- Storz connections Fire Hydrants & Hydrant Assemblies; Contractor shall hire a surveyor in order to place the settlement monitoring points along the Rail Road Right of Ways (Refer to Appendix IV & V). Contractor's Surveyor will monitor the Settlement Points. Surveyor Company must be approved by the Rail Roads companies; All other related work; Section II - S. Gibraltar Water Main Replacement- from M. Gibraltar Rd. to Navarre St.: Remove approx. 3,000 square feet of existing walk; Remove approx. 325 square yards of existing pavement; 1,225 feet of existing water main, 8 inch or less, Flowable Fill; 175 feet of exist. 8-inch or less, water main, Remove; Remove (1) existing Gate Valve and Well; Remove (2) existing Fire Hydrants; Construct approx. 3,000 square feet of 4 inch non-reinforced concrete walk, MDOT Grade S1, on 4 inch sand Base; Construct approx. 100 square yards of 6 inch non-reinforced concrete pavement, MDOT Grade P1, on new 6 inch MDOT 21AA Crushed Limestone Base; Construct approx. 225 square yards of 2 inch HMA Wearing Course, 5E10 Super Pave; Construct approx. 225 square yards of 4 inch HMA Leveling Course, 4E10 Super Pave on new 9 inch MDOT 21AA Crushed Limestone Base; (1) Connection to exist. 8 inch Water Main; (1) Connection to exist. 12 inch Water Main properly completed Bid Bond, Certified Check or Cashier's Check in a sum not less than five (5) percent of the proposed amount of the proposal submitted, shall accompany each proposal as security for acceptance of the Contract by the lowest qualified bidder

Award

Water / Sewer

$2,620,239.00

Public - City

Site Work

24

4

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
347
Active Projects
215
Bidding Soon
2,902
All Active Projects
1,134
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 4, 2023

September 1, 2023

October 30, 2024

img_map_placeholder

Multiple Locations, Gibraltar, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.