Published April 19, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in Wasilla, Alaska. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Matanuska-Susitna Borough is requesting bids from qualified contractors to repair/replace 1,088 linear feet of damaged guardrail along S Big Lake Road. See the Bid Document for details. The Matanuska-Susitna Borough reserves the right to accept or reject any or all bids, waive any and all technicalities or informalities it deems appropriate. Award of this project is subject to the availability of funding. cashier's check, or Bid Bond in the amount of at least 5% Questions Due Date: Apr 3rd, 2023, 5:00 PM AKDT For more information call (907) 861-8601 or e-mail purchasing@matsugov.us. This project's purpose is to repair/replace 1,088 linear feet of damaged guardrail along S Big Lake Road. This project will involve, but is not limited to, removing fugitive material, removing existing guardrail, installing guardrail, and paving guardrail terminal widening. All construction shall be completed in accordance with the Alaska Department of Transportation and Public Facilities (DOT&PF) Standard Specifications for Highway Construction (SSHC) 2017 Edition. Project specific special provisions are provided in the following sections. The requirements contained in these specifications and special provisions are hereby made a part of this solicitation and resultant contract. o This project is located in Big Lake. The project may be accessed from W Susitna Pkwy. See project location and vicinity maps. o Contractor is to provide resources to complete this project without any adjustments in the original bid amount or contract time. o Contractor shall coordinate the road improvements with all utility companies. Request locates from the utilities having facilities in the area. Use the Alaska Digline, Inc. Locate Call Center. See Section 105-1.06 for digline number and a list of utility companies in the area. No relocations are anticipated. o A Vac Truck Item was included to verify utilities locations where they enter the work zone. o Work Zone speed limit: Limit speed of vehicles associated with construction to 20 miles per hour within project limits. o Time is of the essence. Work shall be completed in one continuous timeframe after utility relocations are completed. Substantial completion shall be achieved by September 30, 2023. Final completion shall be achieved by December 15, 2023. o Estimated project magnitude is less than $190,000.

Award

Roads / Highways

$229,956.00

Public - City

Paving, Site Work

15

5

2

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
3
Bidding Soon
149
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2023

May 10, 2023

Project location map

S Big Lake Rd, Wasilla, AK


Fuel growth with access to the bidding project info your business needs.