BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Kansas City, Missouri. Completed plans call for the renovation of a educational facility.

**As of April 14, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** African Centered Elementary (ACE) Installation of split system units with associated ductwork, electrical, controls and structural modifications for gymnasium as per attached bid documents. The work shall be in accordance with the following conditions which will be made part of any contract entered into: 1. Obtain all necessary Permits required for Project and all additional documentation required for process. 2. Shutdown existing units VU-10 and VU-11 serving Gymnasium. Disconnect hot water heat piping. Disconnect supply air duct connection and remove duct transition. Remove existing return air duct boot (See Photos and Sketches) 3. Remove unit cabinet, fan, filters, etc. in entirety. Prepare remaining ductwork for new connections. 4. Modify existing mezzanine and ground for installation of new units. 5. Install new floor mounted DX cooling / hot water heating units on existing mezzanine. Re-connect hot water piping and install accessories as noted per detail. Re-connect supply air duct to outlet of new unit. Provide new return duct with boot full size of unit return air inlet opening. Install new outside air louver and connect to unit. (See New Work Sketch) Gladstone Elementary Installation of replacement dedicated outside air floor mounted unit with associated ductwork, electrical, controls and structural modifications as per attached bid documents. The work shall be in accordance with the following conditions which will be made part of any contract entered into 1. Obtain all necessary Permits required for Project and all additional documentation required for process. 2. Read airflows (supply and outside air) on existing system prior to shut down. 3. Remove existing dedicated outside air floor mounted unit AHU-01. Modify connections, condenser water piping, foundation and ductwork to accommodate new unit. (All Photos & Demolition Sketch) 4. Install new unit and connect new ductwork and condenser water piping into existing. (New Work Sketch) 5. Provide new electrical power for unit. The deadline for submitting questions on this IFB is March 31, 2023 at 4:00 PM CDT. Any questions submitted after that date and time will not be considered or answered. Certifications, Licenses, Tariffs, etc The Vendor is required to submit under any and all required certifications, licenses, etc.

Award

Educational

$1,159,235.00

Public - City

Renovation

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
29
Bidding Soon
719
All Active Projects
304
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 6, 2023

August 15, 2023

img_map_placeholder

Multiple Locations, Kansas City, MO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.