Site work and paving for a mixed-use development in Edgerton, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The City improvement project will replace watermain and sanitary sewer utility piping for the length of Quigley Street in Edgerton. The work includes new utility piping, excavation for new base course and asphalt paving, concrete curb and gutter patching, new water and sewer services and landscape restoration. The Work, in General, Will Include the Approximate Quantities and Items Listed Below: Item Unit Qty Select Demolition of Curb and Gutter (Patchng) L.f. 425 Select Demolition or Abandonment of Water Valve Manholes Ea 3 Removal of Fire Hydrants Ea 3 Excavation (Estimated 2,443 Cy) L.s. 1 Select Trench Backfill Material Ton 300 Geotextile Fabric Type Sas S.y. 4,750 Crushed Aggregate Base, Roadway Ton 3,975 Hma Pavement Ton 1,335 Split Sequencing of Hma Pavement Placement L.s. 1 Concrete Curb and Gutter, 30" Barrier L.f. 620 Concrete Curb and Gutter, 30" Barrier (Patching) L.f. 375 Concrete Sidewalk and Driveway, 6" (Patching) S.f. 950 Topsoil,turf and Grasses S.y. 1,325 Water Main, Ductile Iron, 8" L.f. 1,085 Water Service Pipe, Copper, 1.0" L.f. 450 Water Service Curb and Corporation Valve, 1.0" Ea. 15 Hydrant Ea. 3 Control Valve and Box, Gate, 6", 8" Ea. 8 Sanitary Sewer Service Lateral, Pvc Sdr 35, 6" L.f. 415 Sanitary Sewer Main, Pvc Sdr 35, 8" L.f. 640 Standard Sanitary Manhole V.f. 30 Televising Sanitary Sewer L.f. 640

Bid Results

Roads / Highways

$579,170.00

Public - City

Paving, Site Work

24

14

4

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Construction Progress Documentation, Photographic Documentation, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing, Demolition, Selective Site Demolition, Structure Moving
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings, Common Work Results for Furnishings, Fabrics
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Medium-Voltage Electrical Distribution, Low-Voltage Electrical Distribution
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Finish Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Bases, Ballasts, and Paving, Rigid Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Turf and Grasses, Plugging, Seeding, Sodding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Distribution Valves, Sanitary Sewerage Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
226
Active Projects
125
Bidding Soon
2,619
All Active Projects
1,171
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 12, 2023

June 12, 2023

img_map_placeholder

Quigley St, Edgerton, WI


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Quigley Street, Street and Utility Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.