BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Bouton, Iowa. Completed plans call for site work for a water / sewer project.

Time for Commencement and Completion of Work. Work on the improvement shall commence within 10 days of the date specified on the Notice to Proceed. Notice to Proceed shall be no later than May 19, 2023, Rippey Water Main Replacement Milestone shall be completed on or before July 28, 2023, all work shall be substantially complete on or before November 17, 2023, and all work shall be fully completed on or before May 3, 2024. Damages in the amount of Five Hundred ($500) dollars per day will be assessed for each day the work remains incomplete after the Milestone and Substantial Completion times and Five Hundred ($500) dollars per day will be assessed for each day the work remains incomplete after the Final Completion time. Bid Security. Each bidder shall accompany its bid with bid security, as defined in Section 26.8 of the Iowa Code in an amount equal to Five (5%) percent of the total amount of the bid. Public Hearing on Proposed Contract Documents and Estimated Costs for Improvement. A public hearing will be held by the Board of Directors of the Xenia Rural Water District on the proposed contract documents(plans, specifications and form of contract) and estimated cost for the improvement at its meeting at 5:00 p.m. on April 20, 2023 in the Xenia Rural Water District Office, 23998 141st Street, Bouton, IA 50039 Rippey Water Main Replacement: Installation of approximately 305 linear feet of new 6-inch water main, including associated fittings, valves, hydrants, service reconnections, connections to existing water main, and surface restoration. Linden Water Main Replacement: Installation of approximately 3,200 linear feet of new 6-inch, 4-inch, and 2-inch water main, including associated fittings, valves, hydrants, service reconnections, connections to existing water main, and surface restoration. The Xenia Rural Water District reserves the right to reject any and all bids

Post-Bid

Water / Sewer

$858,773.00

Public - County

Site Work

26

5

6

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
49
Bidding Soon
906
All Active Projects
320
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 11, 2023

May 19, 2023

May 3, 2024

img_map_placeholder

Multiple Locations, Bouton, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.