BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Fitchburg, Wisconsin. Design plans call for site work for a water / sewer project.

As of June 12, 2024, this project is in the design phase and is being designed in house. Construction is anticipated to begin in 2025. Upsize the storm sewer between the Seminole Glen kettle and Schumann Greenway in order to reduce the amount of water entering the kettle. Note: design of the project expected to be completed by City staff. 2021-2030 CIP Update: Added $75,000 for planning and design in 2028 and delay construction from 2025 to 2029. 2021-2030 CIP Council Amendment: Accelerated from 2028/2029 to 2024/2025. 2022-2031 CIP Update: Revised the project timeline to allow for a planning study in 2023. As part of the planning study, hydrologic and hydraulic analysis will be performed to determine potential downstream impacts of the proposed project, provide concept solutions to address localized flooding issues on Schumann, and provide proposed pipe sizes based on analysis of the contributing watersheds. The subsequent timeline would remain the same (preparation of construction plans in 2024 and construction in 2025). 2022 Budget Amendment (expected): Accelerated from 2023/2024 to 2022. Updated funding source 20% by stormwater rates and 80% by Congressional District Spending Appropriation (grant). 2024-2033 CIP Update: Cost increased 3% for inflation from $800,000 to $824,000 *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Design

Water / Sewer

$824,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
137
Active Projects
69
Bidding Soon
2,055
All Active Projects
658
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 2, 2025

img_map_placeholder

To Be Determined, Fitchburg, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.