BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Pocono Township, Pennsylvania. Contact the soliciting agency for additional information.

ITEM # MATERIAL DELIVERY QUANTITY UNITS 1 2A, DGA, Crushed Stone FOB 3,000 Ton 1 2A, DGA, Crushed Stone Delivered 3,000 Ton 2 Cold Patch QPR High Performance FOB 200 Ton 3 #57, 2B, 3/4 " Crushed Stone FOB 200 Ton 3 #57, 2B, 3/4 " Crushed Stone Delivered 200 Ton 4 SP Surge FOB 500 Ton 4 SP Surge Delivered 500 Ton 5 #1, Ballast, 2-4" Crushed Stone FOB 500 Ton 5 #1, Ballast, 2-4" Crushed Stone Delivered 500 Ton 6 2RC Crushed Stone FOB 500 Ton 6 2RC Crushed Stone Delivered 500 Ton 7 #3 Crushed stone FOB 500 Ton 7 #3 Crushed stone Delivered 500 Ton 8 R-3 Crushed stone - Gabion FOB 300 Ton 8 R-3 Crushed stone - Gabion Delivered 300 Ton 9 R-4 Crushed stone FOB 300 Ton 9 R-4 Crushed stone Delivered 300 Ton 10 R-5 Crushed stone FOB 300 Ton 10 R-5 Crushed stone Delivered 300 Ton 11 R-6 Crushed stone FOB 300 Ton 11 R-6 Crushed stone Delivered 300 Ton 12 R-7 Crushed stone FOB 300 Ton 12 R-7 Crushed stone Delivered 300 Ton 13 Asphalt 9.5mm pg64s-22 0.0<0.3 (SRL-L) FOB 2,500 Ton 13 Asphalt 9.5mm pg64s-22 0.0<0.3 (SRL-L) Delivered 2,500 Ton 14 Asphalt 19mm pg64s-22 0.0<0.3 (SRL-L) FOB 1,000 Ton 14 Asphalt 19mm pg64s-22 0.0<0.3 (SRL-L) Delivered 1,000 Ton 15 Asphalt 25mm pg64s-22 0.0<0.3 (SRL-L) FOB 500 Ton 15 Asphalt 25mm pg64s-22 0.0<0.3 (SRL-L) Delivered 500 Ton 16 Tack Oil FOB 1,000 Gallon All quantities of materials are more or less. Material unit prices shall be submitted for the various materials as noted for FOB pickup at the plant, or delivery from the quarry to any location in Pocono Township. All materials to conform to PennDOT Pub. 408 Specifications. Proposals must be upon PennDOT Form MS-963 (11-108) which can be obtained at the Township Building during normal business hours. The bid must be accompanied by a Bid Bond or Certified Check, payable to Pocono Township in the amount of 10% of the bid, and a Certificate of Insurance naming Pocono Township as an additional insured. The successful bidder must furnish a 100% performance bond within 20 days of contract award. The Board of Commissioners reserves the right to reject any or all bids. The Township reserves the right to award the bid to a single bidder or multiple bidders depending on cost of materials, distance to quarry or plant and total cost to the Township.

Post-Bid

Roads / Highways

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
378
Active Projects
154
Bidding Soon
3,502
All Active Projects
1,636
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2023

May 17, 2023

img_map_placeholder

Multiple Locations, Pocono Township, PA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.